Zero Data Used for LLM Training
Co
CoMng.AI Intelligent Project Workspace
AI project management for PMs & PMO leaders

Turn Project Plans Into Real-Time Execution.

Upload a scope document and get a full plan in about a minute. Then CoMng.AI tracks schedules, budgets, and capacity to catch risks early, with no manual status reports.

Start Free
No credit card required Free plan, upgrade anytime Works with Jira, Asana, & MS Project
Cloud Migration & Platform Modernization
Milestones Completed
78% On Schedule
Budget Burn Rate
$84,200 92% Utilized
Risk Status
Healthy (88) 0 Critical
Status Briefing
Auto-Draft Ready ↗
CoMng.AI Gantt & Timeline View
The Reality of Traditional PM

Project delivery shouldn't require 15 spreadsheets and 10 hours of weekly status chasing.

Legacy tools force leaders into administrative data entry instead of strategic leadership. Here is what changes with CoMng.AI.

Manual Status Decks & Pings

The Problem: Project leads waste up to 40% of their week chasing updates on Slack and copying numbers into static slide decks that are outdated by meeting time.

CoMng Clarity

Live workspace telemetry auto-compiles executive summaries in seconds, reflecting true real-time progress.

Surprise Budget Overruns & Scope Creep

The Problem: Minor client scope additions compound quietly until delivery dates slip and project margins are eaten away before anyone notices.

CoMng Clarity

Automatic drift alerts pinpoint schedule slippage and budget deviations weeks before they threaten milestones.

Team Burnout & Hidden Bottlenecks

The Problem: Tasks appear evenly distributed on paper, while 20% of your critical contributors shoulder 80% of the complexity until they burn out.

CoMng Clarity

Predictive 8–12 week capacity heatmaps let you visualize allocation and rebalance workloads with a drag and drop.

Core Platform Architecture

Three Pillars Built for High-Stakes Project Delivery

Designed specifically to help project leaders plan faster, track truthfully, and manage scope without friction.

Pillar 01 • Fast Setup

Instant Genesis: Turn SOWs, Notes, or Prompts into Verified Project Plans.

Upload any statement of work, meeting notes, or project brief to automatically generate a complete Work Breakdown Structure with milestones, dependencies, and owners in seconds. Every generated task links directly back to your source clauses, ensuring bulletproof traceability from day one.

  • Extracts goals, milestones, risks, and budget constraints from 50+ page PDFs
  • One-click baseline creation with verifiable source citation tags
  • Also supports quick CSV imports or conversational scope prompts
Instant Genesis SOW Extraction
SOW Contract → Complete Baseline Framework Click to view ↗
Pillar 02 • Early Warning

Live Health Monitoring: Continuous Risk, Budget, and Workload Tracking.

Monitor project health through automated indicators that track schedule variance, cost burn rates, and deliverable velocity in real time. Receive intelligent advisory alerts that surface exact bottlenecks before minor slips turn into high-stakes crises.

  • Passive telemetry detects schedule delay without constant manual check-ins
  • Automated critical path recalculation highlights downstream collisions
  • Executive advisory memos generated with actionable mitigation steps
Live Health Monitoring Dashboard
Real-Time Early Warning & Advisory Engine Click to view ↗
Pillar 03 • Change Governance

Safe Scope Management: Preview Change Impacts Before Approving Them.

Sandbox proposed scope changes, client change requests, and timeline shifts before touching your production schedule. Compare before-and-after ripple effects across team allocations, delivery deadlines, and project budgets with full audit logs.

  • Visual diff comparisons for Scope, Budget, and Schedule impacts
  • Protect the approved project baseline until changes are formally signed off
  • Complete change request lifecycle tracking with immutable audit provenance
Context-Aware Change Request Sandbox
Sandboxed Change Impact & Baseline Protection Click to view ↗
Streamlined Onboarding

Up and Running in Under 2 Minutes

No lengthy onboarding workshops or complex enterprise training required.

01
Takes 30 Seconds

Connect or Upload

Upload your existing SOW or contract, connect Jira or Asana in 1 click, import a standard CSV, or simply type your project goals into a prompt.

Zero manual framework rebuilding
02
Automated Synthesis

AI Auto-Generates Baseline

CoMng automatically breaks down work packages, maps critical dependencies, estimates realistic durations, and allocates team capacity.

Interactive Gantt & Kanban immediately ready
03
Always Active

Lead & Execute with Clarity

As your team delivers, health metrics update automatically. Auto-generate executive slide decks and receive alerts only when decisions are required.

Hours of weekly status reporting eliminated
See It In Action

See it work before you sign up.

Two short walkthroughs of the product, about 25 seconds each.

Prefer the full overview?

Seamless Ecosystem Fit

Works Alongside the Tools Your Team Already Uses

Eliminate rip-and-replace anxiety. Import your existing data in one click or enhance your workflow with optional developer agent orchestration.

Multi-View Clarity for Every Stakeholder

Switch effortlessly between high-level executive portfolio overviews, detailed critical path Gantt charts, operational Kanban boards, and team resource heatmaps.

Critical Path Orchestration See dependencies and downstream delay impact instantly
Workload Rebalancer Drag-and-drop task reassignment with instant capacity preview
Multi-View Gantt Workspace
Pricing

Start free. Upgrade when your portfolio grows.

No credit card required. The Free plan is yours forever; upgrade to Pro when you need more projects and project manager seats.

Free Forever
$0 / forever

Perfect for trying SOW parsing and managing 1 active project.

  • 1 Active Project
  • 1 project manager seat
  • Unlimited project team members
  • Instant SOW Extraction
  • Full Gantt & Kanban
  • 50 AI credits / month
Start Free
Most Popular
Pro Team
$29 / month

For PMs and delivery leads running multiple projects.

  • 15 Active Projects
  • 5 project manager seats
  • Unlimited project team members
  • 500 AI credits / month
  • Live Health Telemetry
  • Safe Scope Sandbox & Diffs
Start Free, Upgrade Anytime
Enterprise PMO
Per seat / month

For PMOs managing enterprise portfolios and governance.

  • 50+ Active Projects
  • Unlimited project manager seats
  • Unlimited project team members
  • 2,000 AI credits / month, shared by all users
  • Portfolio Roll-Up Dashboards
  • Dedicated Support & SLA

Seats are for project managers who use the platform. Project team members, the people assigned to work, are unlimited on every plan.

Need custom seats or migration help?

Zero LLM Training

Your company data, SOWs, and schedules are never used to train public or private AI models.

TLS 1.3 & Encryption

All data encrypted in transit and at rest using enterprise AES-256 standard protocols.

Role-Based Access

Granular stakeholder access controls with comprehensive, immutable audit logging.

Get Started in 60 Seconds

Ready to Run Projects with
Complete Real-Time Clarity?

Eliminate hours of weekly status compilation and deliver on schedule with verified plan execution.

Free plan available • No credit card required • Cancel anytime
Ready to turn project plans into real-time execution? Generate your first audit-ready project schedule in 60 seconds.