The Strategic Shift — From Administrator to Strategic Leader
Learning Objectives
- Understand why traditional PM work is dominated by administrative overhead
- Understand what "AI-native" means and how it differs from "AI-enhanced" tools bolted onto legacy systems
- Map the four pillars of strategic leadership this course will build: Decision-Making, Risk Mitigation, Team Leadership, and Stakeholder Communication
- Set up your CoMng.AI account and orient yourself in the platform
Project managers spend the majority of their time on work that does not require a project manager: writing status updates, re-typing the same task list into three tools, chasing budget approvals by email, drafting the same kickoff deck for the fifth time this year. Industry studies consistently show that 60–80% of a PM's week is consumed by administrative overhead — planning logistics, documentation, status reporting, and re-keying data — leaving a minority of time for the activities that actually determine project success: judgment calls, risk anticipation, stakeholder alignment, and team coaching.
CoMng.AI is built AI-native from the ground up — not a legacy PM tool with a chatbot stapled on. Every object in the platform (a task, a budget line, a team member, a note, a change request) carries an AI action button that can generate, analyze, assess, or execute that object's content. The practical effect for you as a PM is that the entire "administrative layer" of project management — task breakdown, scheduling, budget drafting, documentation, status reporting — can be generated and maintained by AI, while you supervise, decide, and lead.
The Four Pillars of Strategic Leadership in CoMng.AI
| Pillar | What administrative PM work used to look like | What CoMng.AI automates | What you now do instead |
|---|---|---|---|
| Decision-Making | Manually compiling status from five spreadsheets before every meeting | Project Pulse, RAG Status, Analyze Project Status, IPEMC Evaluation | Walk into every meeting with a pre-computed health score and AI advisory, and spend the time deciding what to do about it |
| Risk Mitigation | Risk registers built once at kickoff and never revisited | RAID+ Register, per-task Risk Assessment, Risk Assess on Project Settings risks | Continuously surface and re-prioritize risk, and spend your time on mitigation strategy, not risk-hunting |
| Team Leadership | Manually matching people to tasks, writing job descriptions and SOWs from scratch | Smart Assign, Workload Analysis, CV Analyzer, Suggest Required Expertise, AI Agent Work Orders | Spend your time coaching, unblocking, and developing people — not data entry |
| Stakeholder Communication | Hours per week writing status decks, emails, and reports by hand | Generate Plan, Meeting Planner, Presentations, Export to HTML, Justification Documents | Review and personalize AI-drafted communications; spend saved hours actually talking to stakeholders |
📺 Orientation Walkthrough
- Log in to your CoMng.AI account and land on the project list (or create your organization if this is a first login).
- Open the Help Centre from the sidebar — note the four categories: Getting Started, Planning & Tracking, Collaboration, Visual Tools, Platform & Integrations. This course mirrors that structure module by module.
- Notice that almost every page in the product has a purple/accent AI button or dropdown — this is the pattern you will see repeated in every module: a normal PM object (task, budget line, team member, note) plus an AI action that does the administrative work for you.
✅ Hands-On Practice 0.1 — Orientation
In your own CoMng.AI account: open the Help Centre and read the titles of all 16 help topics. Write down (in a personal note, on paper, or in the Notes module once you reach it) three administrative tasks you currently do by hand that you expect an AI button somewhere in this list to replace. You will revisit this list at the end of the course to check how many you were right about.
Knowledge Check — Module 0
1. What does "AI-native" mean as used to describe CoMng.AI?
2. According to this course, what is the primary shift CoMng.AI enables for project managers?
3. Which of these is NOT one of the Four Pillars of Strategic Leadership introduced in this module?
Project Genesis & AI Framework Generation
Learning Objectives
- Use all four project creation methods: Project Details Form, Create from Documents, Import from Platform, Chat with AI
- Use Suggest Fields with AI to auto-complete a project brief
- Generate a full project framework (goals, milestones, success metrics, risks) from Project Settings
- Explain when to choose each creation method based on available source material
Every project starts as a blank page — and the blank page is where administrative paralysis begins. CoMng.AI removes the blank page by giving you four entry points, each suited to a different starting condition.
| Creation Method | Best When You Have… | What AI Does |
|---|---|---|
| Project Details Form | Just an idea and a name | "Suggest Fields with AI" pre-fills business area, framework language, timeline, requirements, constraints, blockers — only fields you've left empty |
| Create from Documents | A Charter, SOW, Business Case, or Proposal (PDF/DOC/TXT, up to 3 files, 20MB) | Reads the documents and extracts the full project framework automatically (under a minute) |
| Import from Platform | An existing project in Jira, Asana, MS Project, Trello, or Monday.com | Reconstructs tasks with original statuses, team, milestones, budget, and KB notes from the export file |
| Chat with AI | Only a rough verbal concept, nothing written | Conversational, step-by-step interview that defines scope, goals, team, and timeline as you talk |
Regenerating the Project Framework
Once a project exists, Project Settings exposes Generate Project Framework (or Regenerate, once one exists). This single AI action produces goals, milestones, success metrics, and risks directly from the project description. For best accuracy, write a description that includes: hard deadline, budget ceiling, known resource constraints, and known blockers — the AI factors all of these into milestone spacing and risk identification.
Regenerate is not a blind reset. When you click it on a project that already has a framework, the modal shows you the existing framework as context — so you are refining and updating your description in light of what's already there, not starting from a blank page. The AI then re-derives the full framework using both your edited description and that existing context.
Regenerate vs. Per-Item Estimate/Assess — Which One Should a Manager Use?
This is a real decision point, and the two tool families exist to solve different problems:
| Situation | Use this | Why |
|---|---|---|
| The original scope, budget, or timeline has fundamentally changed (a pivot, a re-scoped deal, a moved hard deadline) | Regenerate Project Framework | The whole structure — goals, milestones, metrics, risks — needs to be re-derived together so it stays internally consistent; editing items one at a time would leave mismatches between, say, a milestone date and a goal it supports |
| You want to know if one specific goal/milestone/metric/risk still reflects reality, without touching anything else | Goal Estimate / Milestone Estimate / Metric Assess / Risk Assess | Faster, targeted, and non-destructive — it leaves every other item untouched while validating the one you're worried about |
| You're preparing for a steering committee and need a quick, broad health check across the whole framework | Run the relevant per-item tools across several items in sequence | Cheaper than a full regenerate when the framework's structure is still valid and only the data behind it has moved |
| A new document (signed change order, revised SOW) redefines the project | Regenerate Project Framework, citing the new document's contents in the description | A structural redefinition needs a structural re-derivation, not a patch |
Keeping the Framework Current — Per-Item AI Assessment
A framework generated once at kickoff goes stale the moment execution starts. Project Settings gives every individual goal, milestone, metric, and risk its own AI assessment button so the framework can be refreshed item-by-item as reality unfolds, instead of only via a full regeneration:
| Tool | Scope | What it does | Output |
|---|---|---|---|
| Goal Estimate | Per goal | Analyses task completion, activities, and timeline progress to estimate the goal's current status and progress % | Inline result with Apply Suggestion to write status/progress back to the goal, or dismiss |
| Milestone Estimate | Per milestone | Estimates whether the milestone is on track, at risk, or likely to be missed, plus a suggested progress % | Applicable to update the milestone's status, or dismissable |
| Metric Assess | Per success metric/KPI | Evaluates the metric against current project data | Saved as a project note (assessment report) |
| Risk Assess | Per identified risk | Produces likelihood, impact, early-warning indicators, and mitigation strategy | Saved as a project note |
📺 Demo Walkthrough — Creating a Project from a Description
- Click New Project → Project Details Form tab.
- Enter a project name (e.g. "Customer Portal Redesign") and a one-paragraph description.
- Click Suggest Fields with AI — watch Business Area, Framework Language, Known Duration, Resource Constraints, and Additional Context populate automatically.
- Review and adjust any field, then save the project.
- From Project Settings, click Generate Project Framework to produce goals, milestones, success metrics, and risks in one pass.
- On one goal, click Estimate and review the suggested status/progress; click Apply Suggestion.
- On one milestone and one risk, run their respective Estimate / Assess buttons and open the resulting notes.
✅ Hands-On Practice 1.1 — Build Your Practice Project
Create a new project using the Project Details Form. Give it a name and a 2–3 sentence description of a real or simulated initiative (e.g. a product launch, an office relocation, a compliance rollout). Use Suggest Fields with AI to fill in the optional fields, then manually edit at least one AI-suggested field to reflect a real constraint you know about (budget, deadline, or team size). Finally, run Generate Project Framework from Project Settings and review the goals, milestones, metrics, and risks it produced. You will use this same project throughout the rest of the course.
✅ Hands-On Practice 1.2 — Compare Creation Methods
If you have an old task export available (CSV/Jira/Asana export, or even a text file listing tasks), try the Import from Platform or Create from Documents path on a second throwaway project, and compare how much faster the resulting structure appears versus your manually-built Practice Project. Alternatively, try the Chat with AI tab and describe your project conversationally — compare how the resulting framework differs from the Form-based one you built in Practice 1.1.
✅ Hands-On Practice 1.3 — Refresh the Framework Item-by-Item
On your Practice Project: run Goal Estimate on every goal and apply at least one suggestion. Run Milestone Estimate on your nearest-due milestone. Run Metric Assess on one success metric and open the resulting note. Run Risk Assess on your highest-severity risk and open that note too. Compare how much faster this item-by-item refresh was versus re-running the full Generate/Regenerate Project Framework.
Knowledge Check — Module 1
1. Which project creation method is best suited when you have a signed Statement of Work document?
2. What does "Suggest Fields with AI" do to fields you have already filled in?
3. Which roles are permitted to create a new project?
4. What four object types does "Generate Project Framework" produce?
5. Which Project Settings tool estimates whether a milestone is on track, at risk, or likely to be missed?
6. After running Goal Estimate on a project goal, how do you actually update the goal's recorded status and progress?
7. Where does Metric Assess save its evaluation of a success metric/KPI?
8. A signed change order fundamentally re-scopes the project's budget and timeline. What should the PM do?
9. When you click Regenerate on a project that already has a framework, what does the modal show you?
Command Hub, Project Pulse & RAG Status
Learning Objectives
- Read the Project Management Hub: stat gauges, unified timeline, recent updates feed
- Run every AI tool in the Project Tools dropdown: Generate Plan, Evaluate Project Stages (IPEMC), Analyze Project Status, Project RAG Status, Analyze Critical Path, Generate RAID+ Register, Find What's Missing, Generate Workplan for AI
- Interpret a Project Pulse health score and its five sub-scores
- Interpret the five-dimension RAG Status scoring rules
The Project Management Hub is your executive cockpit — the page you should open first every single day. Four stat gauges (Tasks, Time/Effort, Team, Budget) plus a unified timeline merging tasks, milestones, activities, and budget dates give you a single-glance status check that used to require pulling four separate reports.
The Project Tools Menu — Your AI Advisory Board
| Tool | What it produces | Strategic use |
|---|---|---|
| Generate Plan | A project note with today's priorities, this week's items, urgent tasks, and quick wins | Start every Monday with this instead of building your own to-do list |
| Evaluate Project Stages (IPEMC) | Score against Initiation, Planning, Execution, Monitoring, Closure | Know exactly which PM discipline is weakest before a steering committee asks |
| Analyze Project Status | Written advisory with recommended actions | A second opinion before you escalate or de-escalate an issue |
| Project RAG Status | Red/Amber/Green across 5 dimensions | One-line health answer for any stakeholder who asks "how's it going?" |
| Analyze Critical Path | The task chain controlling the end date | Know exactly which single task slipping will move your deadline |
| Generate RAID+ Register | Risks, Assumptions, Issues, Dependencies register | A governance artifact ready for audit or steering committee, generated in seconds |
| Find What's Missing | Gap audit across scope, team, budget, planning | Catch the blind spot before it becomes an escalation |
| Generate Workplan for AI | Structured AI execution workplan note | Brief an AI Agent team member with a ready-made plan |
The same dropdown also holds five governance and distribution actions — covered in depth elsewhere in this course, but worth knowing they live right here on the Hub alongside the AI advisory tools:
| Tool | What it does | Where it's covered in depth |
|---|---|---|
| Share Project | Generates a single shareable link exposing the whole project overview to someone outside the platform — a different action from auditing existing links | Result appears in Module 10's Manage Shared Items registry |
| Manage Shared Items | Navigates to the central registry of every share link across the project (tasks, notes, whiteboards, the project itself) | Module 10 |
| Email Integration | Navigates to the inbox/integration setup for the project's dedicated inbound email address | Module 9 |
| Export Project to HTML | Downloads a complete, self-contained HTML snapshot of the entire project — tasks, milestones, budget, team, and notes — for offline viewing or archiving | Used as the Capstone deliverable format (Module 11) |
| Export Project to XML | Downloads a full XML export of the project, compatible with MS Project and other PM tools, for cross-platform data portability | — |
Project Pulse — The Health Score
Pulse computes a 0–100 score from five sub-scores: Schedule (due-date adherence), Budget (spend vs. approved), Velocity (completion rate), Risk (open risk count/severity), and Team (workload balance). 70–100 is Healthy (green), 40–69 is Warning (orange), 0–39 is Critical (red).
RAG Status — The Five Dimensions
| Dimension | Green | Amber | Red |
|---|---|---|---|
| Schedule | ≥70% complete, <10% overdue | 40–69% complete or 10–29% overdue | <40% complete or ≥30% overdue |
| Milestones | None overdue | Exactly 1 overdue | 2+ overdue |
| Risks | 0 risks | 1–3 risks | >3 risks |
| Issues | 0 open issues | 1–3 open issues | >3 open issues |
| Budget | <90% spent | 90–100% spent | >100% spent (overspent) |
The overall RAG colour always equals the worst dimension — one Red dimension makes the whole project Red, regardless of how green everything else is.
📺 Demo Walkthrough
- Open your project's Hub page and read all four stat gauges.
- Click Project Tools → Analyze Project Status and read the AI's written advisory.
- Navigate to Project Pulse and note the overall score and which sub-score is lowest.
- Navigate to Project RAG Status and read the plain-English reason behind each dimension's colour.
- Click Project Tools → Share Project and copy the generated link; note that it now appears in Manage Shared Items.
- Click Project Tools → Export Project to HTML, then separately Export Project to XML, and compare the two output files.
✅ Hands-On Practice 2.1 — Run the Full Advisory Suite
On your Practice Project from Module 1, run all eight AI advisory tools in sequence: Generate Plan, Evaluate Project Stages (IPEMC), Analyze Project Status, Project RAG Status, Analyze Critical Path, Generate RAID+ Register, Find What's Missing, and Generate Workplan for AI. For each, write one sentence (in a Note, once you reach Module 8, or in scratch notes now) capturing the single most useful insight it surfaced that you would otherwise have had to discover manually.
✅ Hands-On Practice 2.2 — Hand the Project to an Outsider
Imagine two different external recipients: a client with no CoMng.AI account who wants a live, always-current view, and a vendor's MS Project administrator who needs to load your schedule into their own tool. From the Project Tools menu, generate the artifact appropriate for each — Share Project for the client, Export Project to XML for the vendor — and also run Export Project to HTML to produce a frozen archive copy for your own records. Confirm the Share Project link shows up correctly in Manage Shared Items.
Knowledge Check — Module 2
1. A project has 0 open risks, 0 overdue milestones, 75% task completion with 5% overdue, and has spent 95% of its approved budget. What is the overall RAG status?
2. Which Pulse sub-score reflects rate of task completion over time?
3. What does IPEMC stand for?
4. Which Project Tools action identifies the task chain that directly controls the project end date?
5. A vendor needs to load your project schedule into their own MS Project installation. Which Project Tools action should you use?
6. What is the key difference between "Share Project" and "Export Project to HTML"?
Tasks & AI Task Automation
Learning Objectives
- Manage the full task lifecycle: fields, statuses, priority score, effort, subtasks, tags, dependencies, discussions
- Switch between the four Task Views (Outline, List, WBS Tree, Lists) and use the full filter/search bar
- Use every per-task AI action: Calculate Priority, Brainstorm, Execute with AI, Quick Execute with AI, Risk Assessment, Create Guide, Create Workplan, Effort Analysis, DoD Analysis, Get Insights, AI Unblock
- Use the project-wide toolbar AI tools: AI Brief, Voice Task, Smart Assign, Optimize Timeline, Merge Duplicate Tasks, Import Tasks, Calculate All Priorities
- Use Bulk Edit (including its toolbar actions) and task sharing/export for stakeholder-facing communication
Tasks are the atomic unit of execution, and historically the single biggest time sink for a PM: writing descriptions, estimating effort, chasing assignment decisions, and re-explaining the same task to three different people. CoMng.AI attaches an AI action to nearly every step of this lifecycle.
Task Fundamentals
Each task carries: title, description, status (Pending / In Progress / Completed / Overdue / Cancelled), an automatically-calculated priority score (High ≥70, Medium ≥40, Low <40 — driven by due-date proximity, complexity, dependencies, and workload — never set manually), effort in hours, dates, assignee, type, subtasks, tags, dependencies, and a discussion thread.
Task Views
Four view toggles sit at the right end of the Tasks page toolbar — distinct from the separate Kanban Board, Gantt Chart, and Calendar pages covered in Module 4:
| View | What it shows |
|---|---|
| Outline View (default) | Every task with status, due date, assignee, tags, and dependencies in a compact, collapsible tree |
| List View | The card-based list, with full filtering by status, type, member, due date, tag, and parent task |
| WBS Tree View | A collapsible outline of the full parent/child hierarchy with auto-generated WBS codes (1, 1.1, 1.2.3 …) — covered in depth in Module 3B |
| Lists View | Colour-coded reference checklists (not tasks) — the same feature introduced as Project Lists in Module 4B; see that module for AI Generate List and item-level detail |
Filtering, Search, and Special States
The filter bar (present on both Outline and List views, and inside Bulk Edit) combines: Status, Type, Member (assignee), Due Date, Tag, and — once at least one parent task exists — a Parent filter that narrows the list to a single WBS branch. A free-text search box narrows by title. The Status dropdown also exposes two special states beyond the five normal statuses: 🚫 Blocked only (every task currently blocked, whether by an incomplete dependency or a manual block) and ⚠️ Scope Creep (tasks flagged as outside the original project scope — see Module 3B).
Dependency Focus Panel (Per-Task)
Click the dependency icon on any task card (in Outline or List view) to open the Dependency Focus Panel — a three-column visual graph: Before (tasks this task depends on — its blockers), Selected (the task you clicked), and After (tasks that depend on this one — what it blocks). This is the fastest way to see the blast radius of a delay before you reschedule anything. It's the per-task counterpart to the project-wide Grouped View on the dedicated Task Dependencies page (Module 3C) — use this panel for a quick "what does this one task touch?" check, and the dedicated page when you need to manage dependencies across the whole project.
Per-Task AI Dropdown
| Action | What it does |
|---|---|
| Calculate Priority | Re-runs the priority score |
| Brainstorm | Sends the task to the Whiteboard for visual ideation |
| Execute with AI | Guided, step-by-step AI execution flow for the task |
| Quick Execute with AI | One-shot execution output — best for short, well-defined tasks |
| Risk Assessment | What could go wrong, likelihood, impact, mitigations |
| Create Guide | Step-by-step execution guide, useful for handoffs |
| Create Workplan | Objectives, activities, timeline, resources, deliverables |
| Effort Analysis | Effort breakdown by activity type |
| DoD Analysis | Definition of Done checklist |
| Get Insights | Free-form AI Q&A panel scoped to the task |
| AI Unblock | Appears only on blocked tasks — suggests how to resolve the blockage |
Project-Wide Toolbar AI Tools
| Tool | What it does | Modes |
|---|---|---|
| AI Brief | Write a brief; AI asks 2–4 clarifying questions then generates a complete task plan as a fully-assessed Change Request | Create Change Request / Auto Apply |
| Voice Task | Speak a task; AI transcribes and structures it | — |
| Smart Assign | AI recommends the best member for every unassigned task based on skills, workload, role | Review & apply, or context-guided ("Alice should not take new tasks") |
| Optimize Timeline | Analyzes effort, dependencies, workload, due dates and proposes a revised schedule | Auto Apply / Create Change Request |
| Merge Duplicate Tasks | Finds and proposes merges for duplicate/similar tasks | Create Change Request / Auto Apply |
| Import Tasks | Extracts tasks from an uploaded file (.txt/.csv/.xml/.json/.html, PDF, or image) into a Change Request | Pending Approval CR |
| Calculate All Priorities | Re-runs the standard priority score calculation for every open task in the project in a single request — use after a batch import, bulk edit, or large dependency change. The per-task Calculate Priority action does the same thing for one task at a time, for spot-checks. | — |
Optimize Timeline — When to Use Which Mode
The hardest part of using Optimize Timeline well isn't running it — it's picking the right mode for the situation. Three common scenarios:
| Scenario | Mode | Why |
|---|---|---|
| Scope absorption — a batch of new tasks lands mid-project against a firm client deadline | Create Change Request | The schedule impact needs sign-off before it's real — this is exactly the stakeholder-approval situation the CR workflow exists for |
| Team availability shift — a team member is unavailable for a stretch and their pending work needs redistributing | Auto Apply | Purely internal re-leveling with no external approval needed — speed matters more than a paper trail |
| Post-sprint cleanup — incomplete sprint tasks need re-leveling into a realistic backlog going forward | Auto Apply | Routine internal housekeeping; provide context like "re-plan from today" to anchor the new schedule |
Two AI buttons appear directly on the card without opening a dropdown: Get Insights and AI Unblock (blocked tasks only). Each task can also be exported individually as a self-contained HTML document, and shared externally (Email, Teams, Slack, Google Chat, Jira, Copy Link) with optional password protection.
Bulk Edit — Full Toolbar
The Bulk Edit view (table icon) opens a separate spreadsheet-style page — every task is a row, and clicking any cell edits it inline: Title, Parent Task, Type, Status, Due Date, Assignee, Effort (h), Priority (sortable), and Tags. The same filter bar as the main task list is present here too, plus column sorting on Status, Due Date, Effort, and Priority. Toolbar actions: Save Changes (writes every pending edit in one request — an unsaved-changes counter tracks how many rows you've touched since the last save), Discard Changes (reverts all unsaved edits), Add Task (appends a blank row), and Delete Selected (removes every checked row).
AI Task Organization — Structuring a Flat Backlog
Once a backlog grows past a few dozen items, the bottleneck shifts from creating tasks to organizing them. Four AI tools handle this restructuring work:
| Tool | What it does | Modes |
|---|---|---|
| Structure Tasks (AI) | Analyses flat, ungrouped tasks and proposes a hierarchy — creating Epic-level parents and reassigning existing tasks as children. Avoids duplicating groups that already exist. | Create Change Request / Auto Apply |
| Auto-Tag Tasks (AI) | Reads each task against goals, milestones, risks, team, and scope; suggests 1–5 relevant tags per task, reusing existing tags and creating new colour-coded ones only when needed. Runs on all tasks or a selected subset. | — |
| Duplicate Task Group (AI) | Select a parent task with children (an Epic/feature group); AI creates an adapted copy of the entire hierarchy, renumbering and adjusting titles/descriptions for a new context you describe. | Create Change Request / Auto Apply |
| Bulk Priority Calculation (AI) | Select multiple tasks (or a root task and its full branch); AI scores each on Urgency, Impact, Dependency, and Confidence and writes a weighted overall priority score (0–100) back to every task. | — |
The AI Brief tool itself, when used for a larger scope addition, produces a full hierarchical work breakdown (Phases → Features → sub-tasks) with dates, effort, types, and descriptions — not just a flat list.
📺 Demo Walkthrough
- Open Tasks on your Practice Project. Click AI Brief, describe a deliverable (e.g. "Build a customer onboarding email sequence"), answer the clarifying questions, and choose Create Change Request.
- Open one resulting task and run Generate Subtasks (AI), then Risk Assessment, then Create Guide.
- Run project-wide Smart Assign and review (without applying) the suggested assignments and reasoning.
- Run Optimize Timeline in Create Change Request mode and inspect the proposed schedule changes.
- Run Structure Tasks (AI) on the same flat backlog and compare the proposed Epic hierarchy to your mental model of the work.
- Switch between Outline View and List View and notice the difference in layout; apply the Member and Tag filters together, then clear them and use the search box instead.
- Open Bulk Edit, change the due date on three rows, watch the unsaved-changes counter increment, then click Save Changes.
✅ Hands-On Practice 3.1 — End-to-End Task Automation
On your Practice Project: use AI Brief to generate a task plan for one real deliverable. Apply the resulting Change Request (you will formalize this further in Module 7). Then, on at least one generated task, run Quick Execute with AI to see a complete AI-produced deliverable, and run DoD Analysis to get a Definition of Done checklist. Finally, run Smart Assign across the whole project and apply at least one suggested assignment.
✅ Hands-On Practice 3.2 — Organize the Backlog
Once your Practice Project has 15+ tasks, run Auto-Tag Tasks (AI) across the whole project and review the tags it applies. Then run Structure Tasks (AI) and review the proposed Epic hierarchy as a Change Request before applying. Finally, run Bulk Priority Calculation on a selected branch and compare the AI's weighted scores against your own gut-feel ranking.
✅ Hands-On Practice 3.3 — Views, Filters, and Bulk Edit
On your Practice Project: filter the task list down to one assignee and one tag simultaneously, then switch to the 🚫 Blocked-only filter and confirm it shows only blocked tasks (mark one task blocked first if none exist yet). Then open Bulk Edit, use Add Task to create two blank rows, fill in their titles and due dates inline, click Discard Changes to confirm you can undo it, redo the edits, and this time click Save Changes. Finally, run Calculate All Priorities from the toolbar and confirm every task's priority badge refreshes.
Knowledge Check — Module 3
1. How can a PM directly raise a task's priority score?
2. Which AI action appears on a task card only when the task is blocked?
3. What does the AI Brief tool ultimately generate?
4. What does Smart Assign consider when recommending an assignee?
5. Which AI tool creates Epic-level parent tasks from a flat, ungrouped backlog?
6. Which Task View shows the parent/child hierarchy with auto-generated WBS codes?
7. What does the 🚫 Blocked-only filter show?
8. In Bulk Edit, what happens if you navigate away without clicking Save Changes?
9. Eight new tasks just landed mid-project and there's a firm client deadline. Which Optimize Timeline mode fits best?
Task Hierarchy & Governance — WBS, Acceptance Criteria, Blocking, and AI Agent Offload
Learning Objectives
- Build a Work Breakdown Structure using Project Scaffold and Break Down Task
- Distinguish subtasks, child tasks, and Acceptance Criteria — and know when to use each
- Operate manual Block/Unblock, Scope Creep detection, and the remaining Task Card Actions
- Offload a task branch directly to an AI Agent and distinguish this from Module 5's per-agent Work Order
Once a project moves past a handful of tasks, the real administrative burden shifts from writing tasks to organizing, governing, and handing off the work. This module covers the layer of the Tasks page that does that: the WBS hierarchy, the definition-of-done mechanics, and the controls that keep a growing task list honest.
Building the WBS — Project Scaffold and Break Down Task
Tasks support a full parent/child hierarchy of unlimited depth — a true Work Breakdown Structure (WBS). Two AI tools build it top-down:
| Tool | What it does | When to use it |
|---|---|---|
| Project Scaffold | Generates the outermost layer in one action — 4 to 8 top-level "epic" parent tasks reflecting the project's major work streams or phases, read from the project's name, description, goals, and milestones | At the start of a project, or after a major scope change, to rebuild the structure from scratch |
| Break Down Task | Takes one existing task and generates child tasks beneath it, at a chosen detail level: 🔷 High-level (2–4 components), 🔶 Standard (4–8 work packages), or 🔸 Detailed (6–12 fine-grained tasks). An optional Guidance box lets you steer it ("Focus on backend only") | Repeatedly, layer by layer, to expand any node in the tree to the depth you need |
Every task is auto-assigned a WBS code reflecting its hierarchy position (1, 1.1, 1.2, 1.2.1 …) — visible in the WBS Tree View and impossible to set manually; it updates automatically as the hierarchy changes. If a task already has subtasks, Break Down Task warns that subtasks and child tasks will coexist: subtasks remain a lightweight checklist inside the task, while child tasks become independent, trackable rows in the WBS tree with their own status, effort, assignee, and dependencies.
Acceptance Criteria — the Third Definition-of-Done Mechanic
CoMng.AI actually has three related but distinct "what does done mean" mechanics, easy to conflate:
| Mechanic | What it answers | Where it lives |
|---|---|---|
| Subtasks | "What steps get the work done?" — execution checklist | Subtasks tab on the task card (Module 3) |
| Acceptance Criteria (AC) | "What conditions must be true before this is signed off?" — the review gate, as a checklist | Acceptance Criteria tab on the task card; can be AI-generated ("Generate with AI") from the title/description |
| DoD Analysis | The same "definition of done" question, but as a generated narrative document rather than a checklist | Per-task AI dropdown (Module 3) |
Use subtasks to track how work gets done, AC to define the review gate before sign-off, and DoD Analysis when you want a fuller document (e.g. for a handoff) rather than a quick checklist.
Block/Unblock, Scope Creep, and the Remaining Task Card Actions
Beyond the AI dropdown, every task card carries a row of utility actions:
| Action | What it does |
|---|---|
| Mark as Blocked / Remove Block | Manually flags a task as stalled by an external factor, with a required reason shown in the badge tooltip. Independent of (but related to) dependency-based blocking — a task can be blocked by an incomplete predecessor and carry a manual block reason at the same time. Both surface in the 🚫 Blocked-only filter and trigger the AI Unblock suggestion. |
| Detect Scope Creep (AI, inside the edit form) | AI evaluates whether the task is still consistent with the project's stated goals/scope and returns a confidence score and explanation; you then decide whether to manually flag it. Flagged tasks show an animated ⚠ Scope Creep badge and are isolated by the dedicated filter. |
| Log Activity | Navigates to the Activities page pre-scoped to this task, to record time spent or progress notes against it |
| Notify Assignee | Sends a notification to the task's assigned member without leaving the Tasks page |
| Send Calendar Event | Sends a calendar invitation (recipients, start/end time, location, notes) for a meeting or work session tied to this task |
| Find Dependencies (AI) | AI scans every other task in the project and suggests likely dependencies based on scope, keywords, and sequence — review and confirm to add the links, instead of manually searching for predecessors |
| Create Budget Line | Creates a budget line from the task's cost estimate, linked back to the task. Only appears when the task has a cost value set. |
| Duplicate | Creates a copy of a single task (no children). For copying an entire parent-plus-children branch, use Duplicate Task Group instead (Module 3). |
Offload to AI Agent — Per-Branch, Not Per-Agent
Module 5 covers Generate Work Order (AI Agent) on the Team page — a briefing of every task currently assigned to one agent. This module's Offload to AI Agent action (in the task's AI dropdown) is different: it generates a complete Markdown work order for one task and its entire child hierarchy — the WBS sub-tree — regardless of who it's assigned to. The work order includes the root task plus all children with WBS codes, internal and external dependencies, subtasks, Acceptance Criteria, project context, and operating instructions referencing the CoMng.AI API so the agent can update statuses and post notes as it works. If your project has AI Agent team members, you can address the work order to a specific one; otherwise it's generated as a generic prompt. The result is both shown as Markdown (Copy / Download .md) and saved as a project note.
| Generate Work Order (AI Agent) — Module 5 | Offload to AI Agent — this module | |
|---|---|---|
| Scope | Every task assigned to one specific agent, across the whole project | One task and its full child branch, regardless of assignee |
| Triggered from | The agent's card on the Team page | The task's AI dropdown (or a parent task's branch) |
| Best for | A daily/weekly briefing for an agent's entire workload | Handing off one well-structured epic or feature for autonomous execution |
The End-to-End AI Agent Workflow
The pieces taught across this course click together into one repeatable, end-to-end sequence — typically under 20 minutes from a blank project to an AI agent actively updating it live:
| Step | Action | Covered in |
|---|---|---|
| 1 | Create the project — AI pre-fills goals, milestones, risks from the description | Module 1 |
| 2 | Add the AI Agent as a team member (name autocomplete: Claude Code, Gemini CLI, GPT-4o, Devin, GitHub Copilot…) | Module 5 |
| 3 | Create Epics — top-level parent tasks for each major delivery track, via Project Scaffold or manually | Module 3B |
| 4 | Break Down each Epic into 4–8 granular child tasks | Module 3B |
| 5 | Offload the branch to the AI Agent — generates the structured Markdown work order | Module 3B |
| 6 | The agent executes the work order directly — no further prompting needed | Module 3B |
| 7 | The agent requests a project-scoped API key before touching anything | Module 10 |
| 8 | The agent reports progress via API calls — tasks, activities, and notes update automatically | Modules 3B, 10 |
This same pattern works for any kind of delivery, technical or not — from a content curriculum like the one in the worked example below to a full software build (the same workflow, applied to a personal finance dashboard with bank-transaction sync, runs five Epics from UI design through database and authentication setup, each broken into its own child tasks with real due dates).
Worked Example — A Real Offload, End to End
This is what an actual generated work order looks like, taken from a real project (lightly anonymized). A task — "Create Content Outline and Sequence" (CoMng Task ID 5974, 8 hours effort, due 2026-06-30) — was assigned to a team member of type AI Agent named "Gemini Agent" and offloaded. The resulting Markdown work order contained: the agent's identity (name, role, CoMng Member ID, CoMng Project ID), the full project context paragraph (goals, team, tech stack, stakeholders, constraints, risks, exclusions — everything Project Settings holds), the task table with WBS code and Definition of Done, and a complete API reference for every endpoint the agent might need.
Three sections turn that document from a briefing into something an AI agent can actually execute against your live project:
| Section | What it instructs |
|---|---|
| Before You Start | "Ask the user for the CoMng.AI API key before beginning any task... Do not proceed without it." The agent is explicitly blocked from touching the project until a human hands it a credential — the human decision point Module 10 calls the principle of least privilege in action. |
| Session Start | 1) GET tasks_list.php?project_id=234 to fetch live task state; 2) GET notes_list.php?project_id=234 to read existing context; 3) create one progress note and keep its note_id for every future update — the agent's single running log for the entire session. |
| Mandatory — After Every Task | Three calls, every time: POST task_update.php (status → completed), POST activity_create.php (logs an "AI Execution" activity with results), POST note_update.php (appends a timestamped one-line summary to the progress note). This is the same Tasks/Activities/Notes loop you've used manually throughout this course — the agent is simply doing it via the API instead of the UI. |
At the end of the session, the work order requires a Final Summary Note — not a bullet list of statuses, but a full narrative: what was built, what decisions were made and why, any deviations from the plan, issues encountered and how they were resolved, remaining risks, and an executive-summary paragraph. The instruction is explicit: "A teammate reading it should understand exactly what happened without needing to read every activity log." That final note is what you, the PM, actually read — the per-task activity log is the audit trail underneath it.
📺 Demo Walkthrough
- On a project with no tasks (or a fresh one), let the AI Task Builder panel appear and click Project Scaffold; switch to WBS Tree View to see the resulting epics with WBS codes.
- Pick one epic and run Break Down Task at Standard detail level; add guidance like "split by frontend and backend."
- Open one resulting child task, add 2–3 Acceptance Criteria manually, then try Generate with AI in the AC manager and compare.
- Mark a task Blocked with a reason, confirm it appears in the 🚫 Blocked-only filter, then click Remove Block.
- Open the AI dropdown on a parent task with children and run Offload to AI Agent; review the generated Markdown work order, identify its Before You Start, Session Start, and Mandatory-After-Every-Task sections, and compare its scope to the per-agent Work Order from Module 5.
✅ Hands-On Practice 3B.1 — Build and Govern a Real WBS
On your Practice Project: run Project Scaffold (or manually create 3–4 top-level tasks if a scaffold already exists), then run Break Down Task on at least two of them at different detail levels. Add Acceptance Criteria to one child task (try AI generation), run Detect Scope Creep on a task you suspect is borderline, and run Find Dependencies on a newly created task to see what AI suggests. Finally, run Offload to AI Agent on one parent branch and save the resulting work order as a note for reference.
✅ Hands-On Practice 3B.2 — Run the Full Offload-to-Update Loop
On your Practice Project: add an AI Agent team member, assign it a small task branch, and run Offload to AI Agent to generate its work order. Then go create the API key this agent would actually need (Module 10): Read & Insert permission, scoped to only Task Management, Activities, and Notes actions, restricted to this one project. In the API Sandbox, manually simulate the "Mandatory — After Every Task" sequence for one task: a task_update call marking it completed, an activity_create call logging the work, and a note_update call appending a one-line summary to a progress note you create first. Finally, write the kind of Final Summary Note the work order requires — a short narrative, not a status list — as if you were the agent reporting back.
Knowledge Check — Module 3B
1. What does Project Scaffold generate?
2. What is the key difference between a subtask and a child task?
3. What question do Acceptance Criteria answer, as distinct from subtasks?
4. Can a task be blocked by a manual reason and an incomplete dependency at the same time?
5. How does "Offload to AI Agent" (per-task dropdown) differ from "Generate Work Order (AI Agent)" (Team page, Module 5)?
6. Per the work order's "Before You Start" instruction, what must an AI agent do before touching any task?
7. What three API calls does the work order mandate after completing every single task?
8. What is the required content of the Final Summary Note at the end of an agent's session?
9. Following least-privilege practice, how should the API key for an offloaded AI Agent be scoped?
10. In the 8-step end-to-end AI Agent workflow, what comes immediately after "Break Down each Epic into child tasks"?
Task Dependencies — Sequencing the Project
Learning Objectives
- Explain why dependencies matter — and what breaks downstream without them
- Use AI Suggest Dependencies to auto-detect a full project-wide dependency map
- Switch between By Blocker and By Blocked grouped views, and use the full filter/search set
- Trace how dependencies surface in the Tasks page (Outline/List view, Focus Panel) and the Gantt chart
Why Dependencies Matter
A dependency links a predecessor (runs first) to a successor (depends on it). This single relationship is the input that several of the platform's most important features rely on: the Gantt chart cannot sequence its timeline correctly without dependencies — without them, the chart has no way to know which tasks must wait for others. Analyze Critical Path (Module 2) identifies the task chain controlling your end date by walking the dependency graph — no dependencies means no meaningful critical path. Optimize Timeline (Module 3) factors dependencies into every rescheduling proposal. Skipping dependency mapping doesn't just leave a page empty — it silently degrades the accuracy of every scheduling and risk tool downstream of it.
First Visit & Dependency Types
The first time you open Task Dependencies on a project with none defined, a welcome dialog offers two paths: AI Suggest Dependencies (analyze everything in one click) or Add Dependency Manually (define one relationship yourself) — or dismiss with Skip for now. Four standard PM dependency types are supported:
| Type | Abbr. | Meaning |
|---|---|---|
| Finish to Start | FS | Successor cannot start until predecessor finishes — the vast majority of real-world relationships (e.g. testing can't begin until development is done) |
| Start to Start | SS | Successor cannot start until predecessor has started — genuinely parallel work that must kick off together |
| Finish to Finish | FF | Successor cannot finish until predecessor finishes — both tasks end together |
| Start to Finish | SF | Successor cannot finish until predecessor has started — rare, just-in-time scheduling |
KPI Bar
| Card | What it shows |
|---|---|
| Total | Number of dependency links defined, and how many distinct types are in use |
| By Type | Breakdown of counts per dependency type — top three shown, with a "+N more" note |
| Completed | Dependencies where both predecessor and successor are completed — the full chain is done |
| Unlocked | Predecessor completed, successor not — these successors are free to start right now. Only appears when at least one exists. |
| Tasks | Count of unique tasks appearing in at least one dependency, as predecessor or successor |
AI Suggest Dependencies — Project-Wide Auto-Detection
The toolbar's AI Suggest button analyzes every task's title, description, and logical execution order and creates a full set of Finish→Start dependency links in one click — existing dependencies are never deleted, only added to. This is the project-wide counterpart to Find Dependencies (Module 3B), which runs the same kind of suggestion for a single task. Use AI Suggest once, early, to build the whole map; use Find Dependencies afterward on individual newly-created tasks. The richer your task titles and descriptions, the more accurate the suggestions — run it after Project Scaffold/Break Down Task have produced well-described tasks, not before.
Grouped View — By Blocker or By Blocked
Dependencies display as collapsible group panels, not a flat list, with a toggle between two grouping modes:
| Mode | Panel headed by | Inside each panel |
|---|---|---|
| By Blocker (default) | A predecessor task | Every task that is blocked by (depends on) that predecessor — "what does this task hold up?" |
| By Blocked | A successor task | Every task that must complete before that successor can proceed — "what is this task waiting on?" |
Each row shows the dependency type badge, a direction arrow, the related task's title (linking straight to it on the Tasks page), due date, status, and a Blocked badge if flagged. Each row has an info button (opens the Dependency Detail panel — predecessor/successor blocks plus an AI Explain button that generates a plain-language reason the link makes sense, re-runnable with Explain Again) and a delete button for that single dependency.
Adding, Filtering, and Cleanup
Add Dependency requires a Dependency Type, a Predecessor Task, and a Successor Task (must differ from the predecessor — the form blocks self-referencing links). The filter bar combines the By Blocker/By Blocked toggle, a Dependency Type filter, a Task filter (narrows to every dependency involving one specific task, as either role), and a free-text search box across both task titles and the dependency type — a live counter shows "Showing X of Y." Remove All deletes every dependency for the project after confirmation — irreversible, use only to start over.
How Dependencies Surface Elsewhere
| Where | How dependencies appear |
|---|---|
| Tasks page — Outline/List View (Module 3) | Dependency count badges on each card; click the dependency icon to open the per-task Dependency Focus Panel (Before/Selected/After) |
| Gantt Chart (Module 4) | Green arrows connecting predecessor bars to successor bars; clicking a task highlights its arrows in yellow and dims unrelated tasks; the chart cannot sequence correctly at all without dependencies defined |
| Critical Path Analysis (Module 2) | The dependency graph is the input AI walks to identify which task chain controls the project end date |
📺 Demo Walkthrough
- Open Task Dependencies on a project with none defined and dismiss or use the first-visit dialog's AI Suggest Dependencies option.
- Review the KPI bar — note the Unlocked count if any predecessor is already complete.
- Switch between By Blocker and By Blocked grouping and notice how the same data reads differently in each.
- Open the Dependency Detail panel on one link and click Explain to get an AI rationale.
- Filter to a single Task and confirm you see only the dependencies involving it; then add one dependency manually.
- Open that same task on the Tasks page and click its dependency icon to open the Dependency Focus Panel; then open the Gantt chart and confirm the dependency renders as a green arrow.
✅ Hands-On Practice 3C.1 — Map and Verify
On your Practice Project: run AI Suggest Dependencies and review the resulting map in both grouping modes. Mark one predecessor task Completed and confirm it appears in the Unlocked KPI. Use the Task filter to isolate one task's full dependency picture, and run AI Explain on one link. Finally, cross-check the same task on the Tasks page (Dependency Focus Panel) and on the Gantt chart (arrow rendering) to confirm all three views agree.
Knowledge Check — Module 3C
1. What breaks if dependencies are never defined for a project?
2. In "By Blocker" grouped view, what does each panel show?
3. What does the "Unlocked" KPI card count?
4. How does project-wide "AI Suggest Dependencies" differ from per-task "Find Dependencies" (Module 3B)?
5. Which dependency type means "both tasks must end together"?
Kanban, Gantt, Calendar & Mind Map
Learning Objectives
- Operate all three Kanban views (Status, Tag, Assignee) and their drag-and-drop behaviors
- Read and filter the Gantt chart, including dependency arrows and the Dependency Path Panel
- Use the Project Calendar, Meeting Planner, and iCal subscription for external calendar sync
- Navigate the Mind Map's five views and Executive Dashboard for stakeholder-ready visuals
Visualization tools turn the same underlying task and milestone data into the view each audience actually needs — and every one of them is generated automatically with zero manual diagramming.
Kanban Board
Three view modes: Status (drag-and-drop updates status), Tag (a task can appear in multiple tag columns; no drag-and-drop), and Assignee (drag-and-drop reassigns; dropping in Unassigned removes the assignee — this does not change status). Cards show a priority border: red = overdue, orange = due today, green = due within 7 days. Suggest Task Details on the add/edit form fills description, type, due date, resources, effort, costs, success factors, and assignee from just a title. Export View saves the filtered board as a PNG.
Gantt Chart — Layout and Task List Panel
Day / Week / Month views; colour-coded bars (Yellow=Pending, Blue=In Progress, Green=Completed, Grey=Cancelled, Red=Overdue, reproduced in a legend at the bottom). Only tasks with at least one date (start, end, or due) appear — dateless tasks are silently excluded. The chart auto-scrolls to today's date on load and renders a maximum of 300 tasks; narrow with filters if you see a "too many tasks" message. The two panels — Task List (left) and Timeline (right) — scroll together as one unit, with a sticky date header.
The Task List Panel shows, per row: a colour-coded dot (diamond for milestones), the name, a meta line (assignee + due date for tasks; just due date for milestones), and on regular tasks a crosshair icon that opens the Dependency Path Panel. Clicking any row highlights it, scrolls/centres the matching bar in the timeline, opens the Task Details Panel, and — for regular tasks — highlights that task's dependency arrows.
Task Highlighting & Dependency Arrows
Dependencies render as green arrows from predecessor bars to successor bars. Click any task bar (or its Task List Panel row) to highlight its dependency chain: the clicked bar gets a solid yellow border, every directly connected predecessor/successor gets a dashed yellow border, the connecting arrows glow yellow with a drop shadow, and every unrelated task dims to 30% opacity so the chain stands out. Click the same task again (or click empty space) to clear the highlight.
For a structured view instead of a visual one, click the crosshair icon next to any task in the Task List Panel to open the Dependency Path Panel — a modal showing Before (Prerequisites), This Task (with status badge and tags), and After (Dependents). Clicking any task inside that panel closes it and jumps straight to that task in the chart.
Milestones & Task Details Panel
Milestones (managed in Project Settings) always appear regardless of the Status/Assignee/Tag filters — only the search box can hide one, by name. They show as a diamond dot + due date in the Task List Panel, as a pair of dashed vertical lines spanning the full chart height in the timeline, and as a 🏁 pill pinned in the sticky date header. Clicking a milestone row centres its lines in view and flashes them briefly.
Clicking any bar or row opens the Task Details Panel from the right. For a regular task: start/end/due dates, status badge, assignee (or "Unassigned"), description (if any), effort (if set), tags (if any), and a View Full Task Details button to the Tasks page. For a milestone: due date, description, and a Manage Milestones button to Project Settings.
Filtering & Search
| Control | Options | Effect |
|---|---|---|
| Status | All / Pending / In Progress / Completed / Overdue / Cancelled | Narrows tasks by status — milestones always remain visible |
| Assignee | All / one entry per active member | Shows only that member's tasks — a personal workload view |
| Tag | All / No Tags / one entry per tag | Shows tasks with (or lacking) the selected tag |
| Search | Free text | Matches task name/description and milestone name |
A live counter shows "Showing X of Y tasks." All four filters combine, and the Task List Panel updates in lockstep with the timeline.
Baselines
A baseline is a named snapshot of every visible task's calculated start/end dates at the moment you save it (e.g. "Sprint 3 Start" or "Client Sign-off 2026-06-01"). Once at least one exists, a Baseline dropdown appears in the toolbar — selecting one activates comparison mode: a thin outlined ghost bar appears behind each current bar at its original baseline position. No visible ghost means the task hasn't moved; a ghost to the left of the current bar means the task has slipped (delayed); a ghost to the right means it moved earlier (accelerated). Select "No Baseline" to return to normal view. Deleting a baseline only removes the snapshot — it never touches actual task dates. Baselines do not auto-update; save a new named one after each re-plan rather than overwriting an old one, building a history of schedule changes over time.
How Task Bar Dates Are Calculated
End date: explicit end date → due date → one day after creation. Start date: explicit start date → backward from end date using effort (hours ÷ 7 hours/day) → one day before end date if no effort is set either. Tasks are sorted by start date in both panels. Set explicit start/end dates whenever precision matters — effort-derived bars drift from reality if effort estimates go stale.
Project Calendar
A read-only monthly grid merging Tasks (blue), Activities (green), Milestones (red), and Budget items with due dates (yellow). Navigate with the ◀ / ▶ arrows or jump back instantly with Today. The URL updates as you navigate and can be bookmarked or shared directly: project_calendar.php?id={project_id}&month={1–12}&year={year} — paste a month-specific link into a team message to point colleagues straight at a busy sprint week.
A task displays on its due date; if that's empty, the calendar falls back to start date, then end date — a task with none of the three is invisible on the calendar entirely. Budget items only appear if a due date is set on the line. Clicking any item opens a detail panel scoped to its type — Task shows description, date, status, type, assignee, effort, and costs; Activity adds duration; Milestone shows just description, date, and status; Budget item adds category, vendor, amount, and payment status. The calendar itself is view-only — edit the item on its source page (Tasks, Activities, Milestones, or Budget) and the calendar reflects the change automatically.
The Meeting Planner generates a structured agenda from current project context — it works best mid-sprint with real activity data; running it on an empty project returns generic output.
The Subscribe button issues a private iCal/WebCal feed (90-day lookback, 2-year forward window) for Google Calendar, Outlook, or Apple Calendar — each team member gets a unique URL. The Subscribe modal has separate tabs: Google / Apple (one URL scheme) and Outlook (a separate webcal:// URL — using the wrong tab's link is the most common subscription error). External apps poll the feed roughly hourly; Google Calendar can take up to 24 hours to reflect changes. 🔄 Regenerate link invalidates the old URL immediately — any existing subscription using it stops updating and must be re-added with the fresh URL, so only regenerate if the link was shared unintentionally.
Mind Map — Nodes, Colours, and Interaction
The Mind Map renders the project as a live, interactive node graph — the centre node is the project itself, surrounded by branches; everything is drawn directly from current project data with nothing to configure. Node colour indicates type: Blue (Project centre), Teal (Work Streams), Pink (Milestones), Orange (Team Health), Red (Risks), Cyan (Budget), Green (Tasks) — and a legend showing this, plus the status icons, stays visible in the bottom-right corner. Status emoji overlay on nodes: 🟢 Healthy, 🟡 Warning, 🔴 Critical, ⚠️ Issue, ✓ Complete.
Click a node to open its Detail Panel on the right (full item detail plus a Go to Page button that navigates straight to that item's source page — e.g. a task node takes you to the Tasks page with that task highlighted); click the central node specifically to open the Executive Dashboard instead. Hover shows a quick tooltip (name, status, key metric). Right-click a task node opens a context menu: view details, navigate to Tasks, or mark complete — directly from the map. The map auto-arranges with a brief physics simulation on load; drag any node afterward to reposition it, though custom layouts are not saved between sessions — every load re-runs the simulation. Canvas navigation: drag an empty area to pan, mouse wheel or the zoom buttons to zoom, Fit to centre and show every node, Center to reset to 100% zoom at the origin (one-finger drag / pinch on mobile).
The Five Map Views
| View | What it shows |
|---|---|
| Overview | The default — central project node with all branches: Work Streams, Milestones, Team Health, Risks, Budget Summary, each expandable to its children |
| Tasks Map | Project centre connected to work stream nodes, each connected to its own tasks, with status colour-coding and assignee info — useful for spotting a work stream with disproportionately many tasks (a resourcing imbalance) |
| Problems | Filters to only nodes flagged as problems or blocked items |
| Blockers | Highlights tasks with a blocked status and their upstream dependencies |
| Overdue | Shows only tasks past their due date |
Use the search box (left of the toolbar) to highlight matching nodes by task name, milestone title, team member name, or risk description — the map zooms and centres on the results. Export downloads the current canvas as a PNG; click Fit first so nothing is clipped.
Executive Dashboard — Five Sections
Open it from the toolbar button or by clicking the central project node:
| Section | Content |
|---|---|
| Key Metrics | Three gauge charts — Health Score, Completion %, Budget Usage |
| Issues & Risks | List of open risks and flagged problems with severity |
| Work Streams Progress | Bar chart of completion % per work stream |
| Team Workload | Bar chart of task load per team member |
| Timeline Status | Days elapsed vs. remaining, and whether the project is on track |
The Health Score gauge is a composite of task completion rate, overdue task count, open risks, and budget consumption — above 70 is generally healthy, below 50 needs attention.
Project Status View — Five Sections
Click Project Status to replace the canvas entirely with a full-screen structured report built for stakeholder meetings, with no node-graph clutter:
| Section | Content |
|---|---|
| KPI Strip | Total tasks, open risks, team size, budget consumed, overall health badge |
| Task Completion | Animated ring chart with a To Do / In Progress / Done / Blocked breakdown |
| Work Streams | Each work stream with its own progress bar and task counts |
| Budget Summary | Total budget, amount consumed, remaining balance |
| Team Status & Capacity | Each member's current task load and availability |
Click Back to Map to return to the node canvas.
📺 Demo Walkthrough
- Open Kanban, switch between Status, Tag, and Assignee views, and drag one card to a new status.
- Open the Gantt chart, switch to Week view, click a task to highlight its dependency arrows (note the solid vs. dashed yellow borders and the dimmed unrelated tasks), then open the Dependency Path Panel via the crosshair icon.
- Save a Baseline, then move a task's due date later on the Tasks page, return to the Gantt chart, select that baseline from the dropdown, and confirm the ghost bar shows the slip direction correctly.
- Apply the Assignee filter to isolate one person's workload, then clear it and use Search instead.
- Open the Calendar, run Meeting Planner with a stated purpose ("Sprint Review"), then click Subscribe, switch between the Google/Apple and Outlook tabs, and copy the correct URL for your own calendar app.
- Click a Task event, then a Milestone event, and compare what fields appear in each detail panel.
- Use the ◀ arrow to go back two months, click Today to return, then copy the address bar URL and confirm it encodes the current month/year.
- Open Mind Map, switch through Overview, Tasks Map, Problems, Blockers, and Overdue, noting which nodes appear/disappear in each.
- Click the central node to open the Executive Dashboard; close it, then click Project Status and compare the two stakeholder-facing views.
- Right-click a task node and mark it complete directly from the map; search for a team member's name and confirm the map zooms to their nodes.
✅ Hands-On Practice 4.1 — Multi-View Status Reporting
Using your Practice Project: export the Kanban board (filtered by one tag) as a PNG, export the Gantt chart as a PNG, and open the Mind Map Executive Dashboard. Imagine you must brief three different audiences (delivery team, a vendor, and an executive sponsor) — note which of the three visuals you would send to each, and why.
✅ Hands-On Practice 4.2 — Calendar Hygiene and Subscription
On your Practice Project: find a task with no due date, start date, or end date and confirm it does not appear on the Calendar; add a due date and confirm it now appears. Set a due date on a Budget line that previously had none and confirm it now shows on the calendar in yellow. Subscribe using whichever app you have access to, and if you ever paste the URL somewhere public by mistake during this exercise, immediately click Regenerate link and note that you'd need to re-subscribe afterward.
✅ Hands-On Practice 4.3 — Brief Three Audiences from One Map
Using your Practice Project's Mind Map: switch to the Problems view and note what surfaces; switch to Overdue and do the same. Open the Executive Dashboard and read the Health Score, then open Project Status and compare its KPI Strip to the Dashboard's gauges. Decide which of the two (Executive Dashboard vs. Project Status) you'd actually screen-share in a steering committee meeting, and why.
✅ Hands-On Practice 4.4 — Track Slip with Baselines
On your Practice Project's Gantt chart: save a baseline named "Pre-Replan." Run Optimize Timeline (Module 3) in Auto Apply mode, or manually push back two tasks' due dates. Return to the Gantt chart, select your baseline from the dropdown, and identify which tasks show a ghost bar to the left (slipped) versus no visible ghost (unchanged). Open the Dependency Path Panel on one delayed task and check whether any of its dependents are also at risk.
Knowledge Check — Module 4
1. In Kanban Assignee view, what happens when you drop a card into a member's column?
2. What is the maximum number of tasks the Gantt chart renders at one time?
3. What colour represents a Budget item on the Project Calendar?
4. Where do you open the Mind Map's Executive Dashboard?
5. What is a Gantt Chart "baseline" used for?
6. Does Suggest Task Details apply tags to the task?
7. A task has no due date but has a start date set. Where does it appear on the Project Calendar?
8. What's the most common cause of a failed Outlook calendar subscription?
9. What happens immediately when you click "Regenerate link" on a calendar subscription?
10. Which Mind Map view highlights tasks with a blocked status and their upstream dependencies?
11. Are custom Mind Map node layouts (dragged positions) saved between sessions?
12. What does right-clicking a task node on the Mind Map let you do?
13. On the Gantt chart's Baseline comparison, what does a ghost bar appearing to the LEFT of the current bar mean?
14. Can you drag a Gantt bar to reschedule a task or draw a new dependency directly on the chart?
15. Do milestone events respect the Status and Assignee filters on the Gantt chart?
Resource Planner & Project Lists
Learning Objectives
- Read team utilization week-by-week on the Resource Planner grid
- Identify and resolve overloaded member-weeks before they cause a slip
- Use Project Lists for lightweight checklists that don't need full task fields
Not every workload question needs a Gantt chart, and not every tracked item needs to be a full task. These two lightweight tools round out your operational toolkit.
Resource Planner
A week-by-week grid showing each team member's utilization across a rolling window of 8–24 weeks. Each cell shows effort hours, capacity percentage, and task count for a member/week combination, colour-coded:
| Colour | Utilization |
|---|---|
| Green | ≤50% utilized |
| Amber | 51–80% utilized |
| Red | 81–100% utilized |
| Dark red | Over 100% (overloaded) |
Clicking a cell opens a panel listing the exact tasks driving that load. Summary cards show total team members, total hours, average utilization, and the count of overloaded member-weeks. You can adjust weekly capacity per member, filter out completed tasks, and navigate Prev / Next / Today — the grid itself is read-only; workload changes are made on the Tasks page.
Project Lists (a.k.a. Lists View)
Named, colour-coded checklists attached to a project — for requirements lists, deployment checklists, country regulations, stakeholder contacts, or anything that needs simple tracking without full task fields (effort, assignee, dependencies, due dates). This is the same feature reachable as the Lists View toggle on the Tasks page (Module 3) — a dedicated space for reference checklists that aren't really "work" in the task sense.
Each list is a named, colour-coded card holding a flat checklist of items. Unlike tasks, an item is lightweight: a checkbox, the item text, and optional remarks (e.g. "confirmed with legal on March 3"). Ticking an item prompts for remarks and records who completed it and when; unchecking clears that record. Create multiple lists, each its own colour; edit or delete a list (deleting removes all its items — not undoable); add, edit, or delete items individually, or bulk-import a set of items at once.
AI Generate List — rather than typing every item by hand, click AI Generate List to populate a brand-new list, or the magic-wand icon on an existing list to add more items to it. Optionally describe what you need ("compliance items for an EU SaaS launch," or mention a specific count like "50 main cities"); AI reads the project's name, description, and business area plus the list's own content to propose new entries, told what already exists so it won't suggest duplicates. Every suggestion is selected by default — untick anything you don't want, then confirm; nothing is added until you do.
📺 Demo Walkthrough
- Open Resource Planner and scan the grid for any red or dark-red cells.
- Click one overloaded cell to see which tasks are driving the overload.
- Adjust that member's weekly capacity or reassign a task on the Tasks page, then return to confirm the cell's colour improves.
- Open Project Lists, create a new list named "Pre-Launch Checklist," and bulk-import 6–8 items.
- On the same list, click AI Generate List and describe a focus area (e.g. "country regulations for an EU launch"); review the suggestions, untick a few, and confirm the rest.
- Tick one item, add a remark, and confirm the completed-by/completed-at record appears; untick it and confirm the record clears.
✅ Hands-On Practice 4B.1 — Find and Fix an Overload
On your Practice Project, open the Resource Planner and identify the most overloaded member-week. Click into it to see the driving tasks, then make one real adjustment (reassign a task via Smart Assign or manually shift a due date) to bring that week back under 80% utilization. Separately, create a Project List for any checklist-style item from your project (e.g. a launch checklist) that does not need full task tracking, and use AI Generate List to populate it instead of typing every item by hand.
Knowledge Check — Module 4B
1. What colour represents a member-week that is over 100% utilized on the Resource Planner?
2. Where do you actually make workload changes after spotting an overload on the Resource Planner?
3. What is the main reason to use a Project List instead of a Task?
4. What does AI Generate List do when run on an existing list with items already in it?
Activities — Time & Work Tracking
Learning Objectives
- Explain the Task-vs-Activity distinction and when one task should accumulate many activities
- Read the KPI bar, filter/search the activity log, and use every card and detail-view action
- Add and edit activities with the full field set, change status, and use Discussions
- Use Create Note from Activity and Export Activities Report for stakeholder-facing records
Tasks describe what needs to happen; Activities describe what actually happened. A single task — say, "Migrate the database" — might accumulate five separate Development activities logged over five days, each with its own duration, cost, and result. Without Activities, that history lives only in memory or scattered chat messages; with it, every hour and every dollar spent is a permanent, exportable record tied back to the work it served.
KPI Bar
| Card | What it shows |
|---|---|
| Total Activities | Total count of all activities on the project; sub-line shows how many distinct activity types exist |
| Hours Tracked | Sum of the Duration field across all activities (activities with no duration are excluded) |
| Completed | Count with status Completed, plus a completion-rate progress bar |
| Active | Count combining Pending, Started, and In Progress |
| Team Members | Active member count, sourced from the Team page |
Adding an Activity — the Full Field Set
Title (required), Description, Type (free-text with built-in suggestions: Meeting, Research, Development, Planning, Testing, Documentation, Design, Collaboration, Review — required), Status (Pending / Started / In Progress / Completed / Cancelled — required), Date (defaults to today — required), Duration in hours (0.5h increments — feeds the Hours Tracked KPI), Team Member (optional), Related Task (optional — links the activity to a task; the link is clickable from both the card and the task), Results (what was produced), Notes (observations/follow-ups), Resources Used, and Costs ($). The same side-panel form is used for both Add and Edit, and a confirmation prompt protects against accidentally discarding unsaved edits.
Activity Cards, Filters, and Status Changes
Each activity is a collapsible card. Collapsed, it shows the title, a colour-coded status badge, duration, and a discussion-count badge if any messages exist. Expanded, it adds a description preview, type/date/team member, the Related Task link, and a results preview. Three filter dropdowns (Status, Type, Member) plus a free-text search box combine in real time, with a live counter showing how many activities are currently visible. The Change Status action opens a compact modal to switch status without opening the full edit form.
Card & Detail-View Actions
| Action | What it does |
|---|---|
| View | Opens the full detail view — every field, with Markdown rendered, including Description, Results, Notes, Resources Used, and Costs |
| Edit | Opens the side panel pre-filled for editing |
| Create Note | Converts the activity into a project note, pre-populated with its content, and redirects you to it in Notes |
| Discussion | Opens a per-activity threaded chat (searchable, Ctrl+Enter to send) — distinct from the Results/Notes fields, which are the permanent record that appears in exports |
| Change Status | Compact status-only modal |
| Delete | Permanent — cannot be undone. Use Cancelled status instead if you're unsure. |
Export Activities Report & Deep Linking
Export Report (toolbar) downloads every activity on the project regardless of active filters — the activity record fields only; discussion messages are never included. Deep links: &activity_id={id} opens one activity's detail view directly; &task_id={id} opens the Add Activity panel with Related Task pre-set and the title/description pre-filled from that task — this is exactly what happens when you click Log Activity on a task card (Module 3B).
📺 Demo Walkthrough
- On a task card in your Practice Project, click Log Activity and confirm the Activities page opens with Related Task pre-set and fields pre-filled.
- Save the activity, then add two more activities of different Types against the same task, with different Durations and Costs.
- Filter the activity list by that Team Member and confirm the counter updates; clear filters and use the search box instead.
- Open one activity's Discussion and post a comment; then run Create Note on it and confirm you land on the new note in Notes.
- Click Export Report and review the downloaded file.
✅ Hands-On Practice 4C.1 — Build an Audit Trail
Pick one task on your Practice Project and log at least three activities against it over a simulated multi-day timeline (different Dates, Types, Durations, and Results). Confirm the Hours Tracked KPI reflects the sum of your durations. Change one activity's status via the Change Status modal rather than the full edit form. Finally, create a note from your most significant activity and confirm it appears correctly in the Notes module.
Knowledge Check — Module 4C
1. What is the core difference between a Task and an Activity?
2. Which field directly drives the "Hours Tracked" KPI?
3. How do you log time for three people who attended the same workshop?
4. What does the `&task_id={id}` deep-link parameter do on the Activities page?
5. Are Discussion messages included when you export the Activities Report?
Team Leadership & AI Agents
Learning Objectives
- Manage all four member types: Internal Employee, External Contractor, Partner/Vendor, AI Agent
- Read the KPI Summary Bar and record Skills with proficiency levels on a member profile
- Use Suggest Details (AI), AI Agent name autocomplete, Suggest Required Expertise, Analyze CV Fit, and the RACI Matrix
- Generate Job Descriptions, SOWs, Work Orders, and Workload Analyses
- Add and brief an AI Agent team member with a generated Work Order
Team leadership is where the strategic shift is most visible: instead of personally drafting job descriptions, SOWs, and workload spreadsheets, the PM directs AI to produce them and spends the reclaimed time on coaching, conflict resolution, and capability-building.
KPI Summary Bar & Member Card
The Project Team page opens with four counters: Total Members, Internal, Contractors, and Partners — a one-glance read on team composition before you even open a single profile. Each member card then shows name, project role, department, member type badge, email, skills with proficiency levels, and the reports-to relationship.
Member Types & the AI Agent Concept
Beyond Internal Employee, External Contractor, and Partner/Vendor, CoMng.AI treats AI Agent as a first-class member type — Claude Code, GPT-4o, Gemini, Devin, GitHub Copilot, and others can be added as team members, assigned tasks directly, and briefed via a Generate Work Order (AI Agent) action that produces a structured markdown document listing every assigned task with full project context (descriptions, due dates, priorities, effort, dependencies, blockers) — ready to hand to an automation pipeline.
Adding a Member — Skills, Suggest Details, and AI Agent Autocomplete
The Add/Edit Member form captures: Name, Role, Department, Member Type, Email, Phone, Reports To, Expertise/Responsibilities, and one or more Skills rows (each a skill name plus a proficiency level — Beginner, Intermediate, Advanced, or Expert). Recorded skills and proficiency are exactly what Smart Assign and Workload Analysis read when matching people to tasks, so an under-filled skills section quietly degrades every downstream AI recommendation.
Suggest Details (AI) — available in both Add and Edit modes — fills in role description, typical skills, and department based on just the name and role you've typed, the same pattern as Suggest Fields on project creation. When the Member Type is set to AI Agent, the Name field also offers autocomplete suggestions for common AI systems: Claude Code, Claude Sonnet, Claude Opus, GPT-4o, GPT-4o mini, Gemini CLI, Gemini 2.0 Flash, GitHub Copilot, Cursor AI, Devin, Midjourney, Stable Diffusion, Perplexity AI, OpenAI o3.
Toolbar & Per-Member AI Actions
| Action | Scope | Output |
|---|---|---|
| Suggest Required Expertise | Project-wide | AI-suggested role cards with Add to Team / Create Recruitment Task / Job Description actions |
| Analyze CV Fit | Project-wide | Candidate fit score against project requirements |
| RACI Matrix | Project-wide | Navigates to the RACI matrix page |
| Job Description | Internal, Partner | AI-generated, project-tailored job description note |
| Create Procurement Task | Contractors | A formal sourcing task in the task list |
| Workload Analysis | All types | A workload balance report from assigned tasks, effort, and deadlines |
| Create SOW | Contractors | AI-generated Statement of Work note |
| Create Work Order | Internal, Partner | AI-generated Work Order note |
| Generate Work Order (AI Agent) | AI Agents | Structured markdown briefing for an AI system/pipeline |
| Duplicate | All types | Creates a pre-filled copy of the member card, ready to edit and save as a new member |
| Notify — Task Summary | Members with email | Email summarizing their assigned tasks |
| Brainstorm | All types | Whiteboard session around the member's role |
Suggested Required Expertise Panel
Running Suggest Required Expertise doesn't just list missing roles — it renders a panel of suggested-role cards below the team grid, each with three independent actions: Add to Team (creates the member immediately from the suggestion), Create Recruitment Task (logs a formal recruitment task in the project task list), and Job Description (generates a job description note for the suggested role even before anyone is hired).
📺 Demo Walkthrough
- Open Project Team and read the KPI Summary Bar (Total / Internal / Contractors / Partners).
- Add a new Internal member: type only a name and role, click Suggest Details (AI), and watch department, skills, and a role description populate. Add at least one skill row and set its proficiency level.
- Click Suggest Required Expertise; review the suggested role cards and try all three actions (Add to Team, Create Recruitment Task, Job Description) on different cards.
- Add a new team member of type AI Agent — note the name autocomplete suggestions — then run Generate Work Order (AI Agent) on it.
- On a human member, run Workload Analysis, then Duplicate the card and discard the copy.
- Open the RACI Matrix page and review the responsibility assignment across your project.
✅ Hands-On Practice 5.1 — Build a Mixed Human/AI Team
On your Practice Project: add at least two human team members (mix Internal and Contractor types), using Suggest Details (AI) on at least one and manually recording skills with proficiency levels on both, plus one AI Agent member (try the name autocomplete). Assign at least three tasks from Module 3 to the AI Agent, then run Generate Work Order (AI Agent) and review the generated markdown briefing. For one Contractor, run Create SOW; for one Internal member, run Job Description.
✅ Hands-On Practice 5.2 — Expertise Gap to Hire
Run Suggest Required Expertise on your Practice Project. Pick one suggested role card you don't currently have filled and run all three of its actions in sequence: generate its Job Description first, then Create Recruitment Task, and finally (once you'd hypothetically hired someone) Add to Team to create the member record. Separately, use Duplicate on an existing member to quickly create a second similar profile, and confirm the KPI Summary Bar counts update correctly.
Knowledge Check — Module 5
1. Which action is exclusive to AI Agent team members?
2. Which member type can have a Create SOW action run on it?
3. What does a generated AI Agent Work Order contain?
4. What are the four Skill Proficiency Levels a team member's skills can be recorded at?
5. What does "Suggest Details (AI)" do on the Add/Edit Member form?
6. On the Suggested Required Expertise panel, which action creates the new team member immediately?
Budget & Financial Stewardship
Learning Objectives
- Read the KPI bar and manage budget line approval/payment lifecycles
- Add/edit a budget line with its full field set, using Suggest Details to complete it
- Operate the per-line payment ledger, Export CSV, and the Full Budget Report
- Use Suggest Budget Lines, Suggest Details, Justification Document, Alternatives, Budget OKRs, and Cost of Delay
- Distinguish approval status from payment status and explain how Spent/Remaining are calculated
- Produce a CFO-ready justification package using only AI-generated content
Budget management used to mean manually building a spreadsheet, chasing approvals by email, and writing a justification memo from scratch every time a stakeholder asked "why do we need this?" CoMng.AI generates the entire budget skeleton, the justification, and the financial framing automatically.
KPI Bar & Two Independent Lifecycles
Five KPIs: Total Budget, Approved, Spent (driven by actual payment records, not line amounts), Remaining (red if overspent), % Utilized (green <70%, orange 70–89%, red ≥90%). Two lifecycles run independently: Approval status (Draft → Pending → Approved/Denied, or Removed for audit-preserving exclusion) and Payment status (Unpaid → Partial → Paid), tracked via a per-line payment ledger.
Adding/Editing a Budget Line
The add/edit form captures: Title, Category (Software, Hardware, Services, Consulting, Development, Training, Marketing, Advertising, Office Supplies, Travel, Other), Vendor, Description, Amount, Currency (USD, ILS, EUR, GBP — multi-currency lines show KPIs per currency, with no automatic conversion), Status, Payment Status, Payment Due Date, Payment Method, External Reference (invoice/PO number), Approver Name, Approver Remarks (markdown supported), Related Tasks, and Tags. As with Tasks and Team, Suggest Details takes a typed description and fills in the rest — title, amount, currency, payment method, approver remarks — based on project context, without overwriting anything you've already entered.
The Payment Ledger
Each budget line carries its own payment ledger, separate from the line's approval status. Record one full payment or several partial payments over time; each payment entry has its own Amount, Date, Method (Bank Transfer, Credit Card, Cash, Check, PayPal, Other), Reference/Receipt number, and Notes. A progress bar on the line shows amount paid against the total line amount. This ledger — not the Payment Status label and not the line's face amount — is what actually drives the Spent and Remaining KPIs at the top of the page.
Export CSV & Full Budget Report
Export CSV downloads every budget line in the project as a CSV file — for reconciliation in a spreadsheet, import into a finance system, or attaching to an expense report. Full Budget Report opens a formatted HTML report in a new tab, covering every line with its status, payments, and KPIs in a printable, shareable layout — the budget equivalent of Export Project to HTML, scoped to just the financials.
AI Tools for Budget
| Tool | What it produces |
|---|---|
| Suggest Budget Lines | Draft budget lines from project goals/scope/risks (auto-triggers on first visit to an empty budget) |
| Suggest Details | Fills title, amount, currency, payment method, approver remarks from a typed description |
| Justification Document | Why the expense is necessary, alignment to goals, consequences of non-approval — saved as a note |
| Alternatives | Vendor/approach comparison with cost and trade-off analysis |
| Budget OKRs | Objectives and Key Results turning the expense into a measurable outcome |
| Cost of Delay | Cost/schedule/value impact of delaying approval or payment |
| Brainstorm | Opens a Whiteboard session around the cost item |
📺 Demo Walkthrough
- Open Budget on your Practice Project (or a fresh project) and let Suggest Budget Lines auto-trigger, or click it manually.
- Open one suggested line, type a one-line description, set its Amount and Currency, and click Suggest Details to fill the rest.
- Run Justification Document and Cost of Delay on that line; open both resulting notes.
- Record two partial payments on the line (different methods, e.g. Bank Transfer then Credit Card) and watch the progress bar and the Spent/Remaining KPIs update after each.
- Click Export CSV and open the downloaded file; then click Full Budget Report and review the formatted HTML report in the new tab.
✅ Hands-On Practice 6.1 — Build and Defend a Budget Line
On your Practice Project: generate at least 5 budget lines with Suggest Budget Lines. Pick the single largest line, run Alternatives and Budget OKRs on it, then move it through Draft → Pending → Approved status. Record one payment against it and verify the KPI bar updates correctly.
✅ Hands-On Practice 6.2 — Reconcile and Report
On a budget line with at least one prior payment, add a second partial payment with a different payment Method and a Reference/Receipt number, and confirm the line's progress bar reflects the combined total. Then produce both export artifacts from the Budget toolbar: Export CSV (for a finance-system import) and Full Budget Report (for a stakeholder-facing printable summary) — and note which fields appear in one but not the other.
Knowledge Check — Module 6
1. The "Spent" KPI is driven by:
2. Which budget status keeps a line out of all KPI totals but preserves it for audit purposes?
3. Which AI tool calculates the cost/schedule/value impact of NOT approving a budget line on time?
4. What drives the Spent and Remaining KPIs at the top of the Budget page?
5. Which output is best suited for importing budget data into an external finance system?
Change & Risk Governance
Learning Objectives
- Operate the full Change Request lifecycle: Draft → Submitted → Pending Approval → Approved → Applied → Closed (plus Deferred/Rejected)
- Create Change Requests from all six origin points and run AI Assessment
- Apply or skip impact items individually, and export CRs for stakeholder approval
- Generate and act on a RAID+ Register and per-risk AI assessments
Change Management is the governance layer that turns "someone asked for a change" into a controlled, auditable, AI-assessed decision — instead of an ad-hoc scope creep conversation in a hallway or a Slack thread that nobody remembers six months later.
The Change Request Lifecycle
Draft → Submitted → Pending Approval → Approved → Applied → Closed, with side-statuses Deferred and Rejected. A CR carries Title, Description, Category (Scope/Budget/Schedule/Resource), and Priority (Low/Medium/High/Critical).
Seven Ways a CR Gets Created
| Origin | Mechanism |
|---|---|
| Manually | New Change Request button, save Draft or Submit |
| AI Brief (Tasks toolbar) | Fully-assessed CR at Pending Approval |
| Knowledge Base note | "Convert to Change Request" in the note's AI dropdown |
| Optimize Timeline | Create Change Request mode produces a CR with schedule changes |
| Import Tasks | Extracted tasks land in a CR at Pending Approval |
| Whiteboard | Board → Change creates a draft CR from canvas content |
| Smart Assign / Merge Duplicate Tasks | When run in Create Change Request mode (instead of Auto Apply), the suggested assignments or merges arrive as a CR for review |
Once Submitted, Run AI Assessment analyses the CR against full project context and produces an impact assessment across scope, budget, schedule, and resources, moving the CR to Pending Approval. From there: Export for Approval (a standalone HTML document for offline sign-off), Authorize, Defer, or Reject. Once Approved, impact items can be applied individually or all at once with Apply All; each item can instead be Skipped without affecting the rest.
The Three Real-World Paths Into a Change Request
Scope changes rarely arrive as a tidy, ready-to-formalize request — they arrive as a stray sentence in a meeting note, a casual customer email, or an attached document nobody has read yet. Without a fast conversion path, these get absorbed informally: no impact assessment, no budget check, no audit trail, and the project quietly drifts from its approved scope. Three paths funnel exactly this kind of informal input into a governed CR:
| Source | Path | Covered in |
|---|---|---|
| A meeting note or any existing Note | Note's AI dropdown → Make Change Request | Module 8 |
| A customer email | Email arrives as a CII insight → convert insight to a Note (preserves the audit trail back to the original message) → run Make Change Request on that note | Module 9 → Module 8 → this module |
| An uploaded document (PDF or image) | Attach to a Note → Analyze File (AI extracts/summarizes it) → Make Change Request, with the document's content folded into the CR's context | Module 8 |
Whichever path it travels, the result is the same: a CR with a full impact assessment, sitting at Pending Approval, traceable backward to the exact note, email, or document that started it — so a budget dispute six weeks later can be settled by following that trail instead of arguing from memory.
RAID+ and Risk Governance
The RAID+ Register (Risks, Assumptions, Issues, Dependencies, plus anything else AI identifies) is generated from the Hub's Project Tools menu as a single comprehensive note. In Project Settings, each identified risk has a per-risk Risk Assess button producing likelihood, impact, early-warning indicators, and mitigation strategy as a saved note.
📺 Demo Walkthrough
- Open Change Management, click New Change Request, fill Title/Description/Category/Priority, and Submit.
- Click Run AI Assessment and read the resulting impact analysis.
- Authorize the CR, then apply one impact item individually and Skip another.
- From the Hub, run Generate RAID+ Register and open the resulting note.
✅ Hands-On Practice 7.1 — Govern a Real Change
Take the Optimize Timeline Change Request you created in Module 3 Practice (or create a new manual CR describing a scope addition). Run AI Assessment, review every impact item, Export for Approval as an HTML document, then Authorize and apply all items. Separately, generate a RAID+ Register for your Practice Project and run Risk Assess on the single highest-severity risk it surfaces.
✅ Hands-On Practice 7.2 — Trigger a CR from Every Eligible Origin
On your Practice Project, generate at least three CRs from three different origins to build muscle memory for where change governance actually lives: run Merge Duplicate Tasks in Create Change Request mode, convert a Knowledge Base note into a CR via its AI dropdown, and use the Whiteboard's Board → Change action on a brainstorm board. Then try to find a "Convert to Change Request" action on a budget line or a team member — confirm it does not exist, and note that a budget- or resource-impacting change must instead go through a Note or AI Brief, tagged with the CR's Budget or Resource category.
Knowledge Check — Module 7
1. What is the correct Change Request lifecycle order?
2. What action moves a Submitted CR to Pending Approval?
3. What does RAID+ stand for?
4. Can an individual impact item within an Approved CR be skipped without affecting the rest?
5. Which module has NO direct "Convert to Change Request" or "Create Change Request mode" action?
6. When Smart Assign or Merge Duplicate Tasks is run in Create Change Request mode, what happens?
7. A customer's scope request arrives by email. What is the correct path to turn it into a governed Change Request?
Knowledge Base, Whiteboard & ARI
Learning Objectives
- Create and manage every Notes type: AI-generated, template-based, and imported
- Use every per-note action: View, Edit, Discussion, Live Share, Create Document, and the full AI dropdown (Ask AI, Summarize, Brainstorm, Present, Make Change Request, Analyze File)
- Use Ask Me (project-scoped and general-business), What-if Scenario, Voice Note, Project Files, and Export Notes
- Operate the Whiteboard's drawing tools, templates, and ARI AI panel
- Use the four Board AI Quick Actions: Generate Ideas, Board→KB, Board→Tasks, Board→Change
Knowledge work — meeting minutes, risk registers, onboarding guides, decisions — is exactly the kind of writing that consumes a PM's evenings. The Notes module and the Whiteboard's AI assistant ARI exist to absorb that writing load.
Notes — AI-Generated, Template-Based, and Imported
AI-generated note types: Project Key Questions, Risk Assessments, Project Risk Analysis, Analyze Project Item, Competitor Analysis, Roadmap Builder. Template-based: Project Scope, Business Case, Schedule Document, Communication Plan, Expected Deliverables, Stakeholders Definitions, Project Org Chart, Roadmap, Decision, Document, Meeting Notes, Action Items.
Import sources — each one read and summarised by AI into a structured note: PDF (reads and summarises the document), Image (extracts text and describes visual content), Webcam Capture (photographs a physical whiteboard or document and analyses it), Web Page (paste a URL and AI extracts/summarises the page), Draw.io Diagram (analyses and documents the diagram), Configuration Files (YAML, JSON, XML, or any similar config format — AI analyses the structure), CSV File (analyses and summarises the data), and Text File (imports plain text content).
Per-Note Actions — Card Toolbar and AI Dropdown
Every note card carries a consistent set of actions, independent of how the note was created:
| Action | What it does |
|---|---|
| View | Opens the note in read mode |
| Edit | Opens the markdown editor for the note |
| Discussion | Opens a threaded comment panel scoped to that note — separate from Ask Me, this is where the team debates or annotates the note's content directly |
| Live Share | Generates a shareable external link to the note (password and expiry options, same pattern as other shareable items) |
| Create Document | Exports the note as a Word-compatible document |
| Compact toggle | Switches the whole note list between full and compact display |
| Delete | Permanently removes the note |
The robot-icon AI dropdown on each note card adds a second layer of actions on top of the note's existing content:
| AI Action | What it does |
|---|---|
| Ask AI | Send a free-form question about that specific note's content to AI |
| Summarize | AI generates a concise summary of the note |
| Brainstorm | Sends the note to the Whiteboard for visual brainstorming around its content |
| Present | AI creates a presentation outline from the note |
| Create Tasks from Note | AI reads the note (meeting minutes, action items, any content) and extracts every actionable item as a new task — created immediately in the task list, with no Change Request review step. Different from Make Change Request: this is direct, ungated creation, so review the output and delete anything that doesn't apply. |
| Make Change Request | Converts the note's content into a fully-assessed Change Request (see Module 7) |
| Analyze File | Appears only when the note contains an embedded file; AI analyses that attached file specifically |
Ask Me, What-if, Voice Note, Project Files, and Export Notes
Ask Me offers two modes: Project Answer (full project context — tasks, team, budget, timeline) or General Answer (no project context, general business/world knowledge only). General Answer is the right mode whenever your question isn't really about this project's data at all — drafting a business model canvas for a new offering, validating a raw idea before it becomes a project, exploring a growth-strategy framework, or asking a generic "how do other companies typically approach X?" question. Project Answer is for everything that needs your actual tasks, budget, or team to answer correctly. Both modes save the conversation as a knowledge base note for future reference.
What-if Scenario analyses an alternative ("what if we reduce the team by 2 people?") and saves the findings as a note. Voice Note transcribes live recordings or uploaded audio and extracts key points and action items. Project Files (toolbar button) opens a browser for every file attached to the project across all sources — uploaded documents, imported files, embedded note attachments — in one place. Export Notes (toolbar button) downloads every note in the project as a single, formatted HTML report — your entire knowledge base as one shareable, archivable document.
Whiteboard & ARI — Preview
The Whiteboard is a full collaborative visual canvas with AI built in, covered in depth in Module 8B — including the complete tool palette, ARI's AI panel and quick actions, sharing, and live collaboration. This module's demo and practice focus on Notes; head to Module 8B for the Whiteboard's own hands-on exercises.
📺 Demo Walkthrough
- Open Notes, click + Add Note → Roadmap Builder, and let AI build an interactive roadmap.
- On that note, open the AI dropdown and try Summarize, then Present; open Discussion and post a comment.
- Import one external source — paste a URL into Import → Web Page, or upload a CSV or config file — and review the structured note AI produces.
- Open Ask Me and ask a project question in Project Answer mode; then switch to General Answer mode and ask something unrelated to the project, like "outline a lean business model canvas for a subscription box service."
- Click Project Files to browse every file attached to the project, then click Export Notes to download the full knowledge base as one HTML report.
✅ Hands-On Practice 8.1 — Knowledge Base Roundtrip
On your Practice Project: run a What-if Scenario ("What if the deadline moved up by one month?") and read the resulting analysis note. Then convert one note's content into a Change Request via Make Change Request, and a different note's action items into tasks via Create Tasks from Note — compare the two outcomes.
✅ Hands-On Practice 8.2 — Exercise Every Note Action
Pick one existing note on your Practice Project and run through its full action set: View it, Edit a sentence, open Discussion and post a comment, generate a Live Share link, and Create Document to export it as Word. Then open its AI dropdown and run Ask AI (ask a question about the note's own content), Summarize, and Brainstorm (send it to the Whiteboard). Separately, use Ask Me in General Answer mode to validate a rough business idea unrelated to your current project (e.g. "what would I need to test before launching a subscription box service?") and confirm the conversation saves as a note.
Knowledge Check — Module 8
1. What is ARI?
2. Which Whiteboard AI Quick Action creates draft Change Requests directly from canvas content?
3. In the Ask Me panel, what is the difference between Project Answer and General Answer mode?
4. How does a Note's content typically get filled in, compared to a Task or Budget line?
5. You want to validate a brand-new business idea that has nothing to do with your current project's data. Which Ask Me mode should you use?
6. Which per-note action opens a threaded comment panel for team debate on that specific note's content?
7. What does the "Export Notes" toolbar button do?
8. Which note AI dropdown action only appears when the note contains an embedded file?
9. How does "Create Tasks from Note" differ from "Make Change Request"?
Whiteboard Deep Dive — Canvas, ARI, and Sharing
Learning Objectives
- Explain why the Whiteboard exists — what administrative loss it solves for distributed teams
- Use every drawing tool, the full Context Toolbar, and Canvas Navigation
- Operate ARI's AI panel, its four Quick Actions, and per-element AI Improve
- Use Task → Board, Sharing, Comments/Voting, and Live Collaboration
Why We Have It
Every project generates ideas faster than it generates structure: a kickoff workshop, a "what if" debate, a risk-mapping session. In a room with a physical whiteboard, that thinking either gets photographed and forgotten, or someone spends an evening manually re-typing it into tasks and notes. The Whiteboard exists to remove that translation tax entirely — and because teams are distributed, it also replaces the physical whiteboard itself, with the added advantage that nothing typed on it is ever lost (auto-save) and an AI teammate, ARI, sits inside the session ready to convert raw sticky notes into structured project objects the moment the conversation ends.
Boards & Tabs
Each project can have multiple boards, organized as tabs along the bottom bar; "Board 1" is created automatically on first visit. Switch boards by clicking a tab (or the dropdown for many boards), create a new one with the + button, rename via the pencil icon, and delete via the ✕ icon — deletion is permanent and removes every element on that board, with no recovery.
Tool Palette & Canvas Navigation
The vertical left-side palette holds: Select (V), Pan (H, or hold Space), Sticky Note (N), Text (T), Rectangle (R), Ellipse (O), Diamond (D), Triangle, Line (L), Arrow (A), Pen — freehand (P), Frame — labelled grouping area (F), Image upload (I), and Templates. After placing a shape, the tool automatically reverts to Select so you can immediately reposition it.
Bottom-right canvas controls: Zoom out/in (Ctrl+−/Ctrl+=), zoom percentage display, Fit to Screen (Ctrl+0 — zooms/pans so every element is visible), a dot-grid toggle for alignment, Export PNG, and a Minimap toggle for navigating large boards.
Context Toolbar (Element Selected)
| Group | Controls |
|---|---|
| Styling | Fill (8 swatches + custom picker), Border colour, Border width (None/1–4px), Opacity (10–100% slider) |
| Layer | Bring to Front, Send to Back |
| Element actions | Duplicate (Ctrl+D), AI Improve (ARI rewrites/enriches the selected note or text in place), Vote (upvote, count shown), Comment (opens the comments panel for that element), Delete (Del) |
| Text formatting (text/notes only) | Font size (10–64pt), Bold/Italic, text colour, alignment (Left/Center/Right) |
| Header (always visible) | Share, AI (opens/closes the ARI panel) |
Templates
Blank, Brainstorm (central idea + surrounding sticky notes), SWOT Analysis (4 labelled frames), Sprint Retro (What Went Well / To Improve / Action Items columns), Mind Map (central node + branches), Kanban (To Do / In Progress / Done columns). Applying a template replaces all existing content on the current board — confirm you're on the right tab first.
ARI — the AI Panel and Quick Actions
Open ARI via the AI button in the context bar header. Type a message and press Enter (Shift+Enter for a new line without sending) — ARI has full project context (tasks, budget, team, activities) and places generated elements directly on the canvas, confirming how many it added.
| Quick Action | What it does |
|---|---|
| Generate Ideas | 6 creative sticky-note ideas for the project, placed in a grid |
| Board → KB | Synthesises all board content into a structured Knowledge Base note |
| Board → Tasks | Creates actionable project tasks from everything on the canvas |
| Board → Change | Creates one or more draft Change Requests from board content for PM review |
Task → Board — the Reverse Direction
The flow doesn't only go from board to project objects — it also runs the other way. The Brainstorm action in any task's AI dropdown (Module 3) reads that task's title, description, type, status, effort, and success criteria, generates a cluster of relevant sticky notes (approaches, open questions, risks, solution ideas), creates a brand-new board pre-populated with them, and drops you straight into it. From there you can add your own notes, group with Frames, then run Board → Tasks or Board → Change to turn the refined thinking back into structured work.
Sharing with Third Parties
Click Share in the context bar header. Set an optional password (blank = open access) and an expiry (Never, 1 day, 7 days, 30 days), then Generate Link. Recipients need no CoMng.AI account and get view-only access to the board as it existed when they open the link — exactly the same sharing pattern used for Tasks, Notes, and the whole Project (Modules 3, 8, 10).
Comments, Voting, and Live Collaboration
Select any element and click Comment to open a threaded discussion scoped to that element, or Vote to upvote it (useful for democratic prioritization — let the team surface the sticky notes that matter most). When multiple people open the same board, presence indicators show who's viewing; cursor positions sync roughly every 3 seconds and element changes sync every 5 seconds — changes from one person appear on everyone else's screen automatically, no refresh needed.
📺 Demo Walkthrough
- Create a second board, rename it, apply the SWOT Analysis template, then switch back to Board 1.
- Place a sticky note, a frame, and an arrow; select the sticky note and try Fill colour, Border width, and AI Improve.
- Open ARI and click Generate Ideas; then run Board → Tasks and review the tasks it created.
- On a task in your Practice Project, run Brainstorm from its AI dropdown and confirm a new pre-populated board opens.
- Generate a Share link with a password and a 7-day expiry; copy it.
- Use Fit to Screen, then Export PNG, and confirm the downloaded image captures every element.
✅ Hands-On Practice 8B.1 — From Brainstorm to Backlog
On your Practice Project: open a new Whiteboard, apply the Brainstorm template, add at least 5 sticky notes describing risks or opportunities (try Voting on a couple), then run Board → KB to create a knowledge base note and Board → Tasks to generate tasks from the same content. Separately, run Brainstorm on an existing task and compare how that pre-populated board differs from one you built from a blank template.
Knowledge Check — Module 8B
1. What problem does the Whiteboard primarily solve, per this module?
2. What happens when you apply a template to an existing board?
3. What does the task-level "Brainstorm" AI action (Module 3) do?
4. Do recipients of a shared Whiteboard link need a CoMng.AI account?
5. Roughly how often do element changes sync between collaborators on the same board?
Customer Insights (CII) & Email Automation
Learning Objectives
- Capture and triage customer feedback through the CII inbox
- Convert any insight into the ten supported project object types
- Configure project email integration, tokens, and the email pipe toggle
- Interpret AI email classification outcomes and statuses
External input — customer feedback, support escalations, stakeholder emails — traditionally arrives scattered across inboxes and gets manually re-typed into the project. CII and Email Integration eliminate that re-typing entirely.
Customer Insights (CII)
Insights arrive manually (New Insight) or automatically via a dedicated per-project email address (prj-{customerId}-{projectId}@comng.ai) using a regenerable secret CII token. Each insight records received date/time, source, content, status, and PM Notes (internal-only annotations). From the detail modal, one click converts an insight into any of: Task, Note, Budget, Calendar, Milestone, Issue, Assumption, Requirement, Risk, or Metric — after which it is marked converted so it cannot be actioned twice.
AI Intent Classification
Every insight can be automatically classified into one of 8 intent types — happening automatically on inbound emails, or triggerable manually from the insight detail view for anything entered by hand: Complaint, Bug Report, Feature Request, Question, Feedback, Praise, Suggestion, and Other. The AI reads the full message text and picks the best fit; you can always override its choice by editing the insight. The classification is a first pass, not a final verdict — spot-check a few insights per week, especially from new customers, until you trust the quality for your context.
Insight Status Workflow
Every insight moves through a status lifecycle distinct from its intent classification: New → In Progress → Acknowledged → Resolved, with three alternative terminal states — Closed (no full resolution, e.g. duplicate or out of scope), No Solution (reviewed, no solution currently available), and Canceled (retracted or no longer relevant). The Status Summary bar at the top of the CII page gives a live count per status — click any status to filter the list to just that state.
Email Integration
Each project has a unique inbound address. Two separate tokens exist: the Internal Secret Token (for internal/automated emails — never shared externally) and the Customer Insights Token (CII Token) (shared with customers so their mail routes to CII, not internal project objects). The Email Pipe toggle can pause automated processing while still receiving and storing mail. AI classifies each email into Task, Note, Budget, Calendar, Activity, CII, or Ignored, with per-email statuses Pending, Processing, Done, Failed, or Ignored, and per-email actions Process Now, Retry, and Delete.
📺 Demo Walkthrough
- Open Customer Insights (CII), click New Insight, and paste a sample piece of feedback ("Customers are asking for a dark mode toggle").
- Open the insight and check its AI-assigned intent classification; override it if the AI guessed wrong.
- Move the insight through its status lifecycle: New → In Progress → Acknowledged → Resolved, using the Status Summary bar to filter by each state as you go.
- Convert it to a Task; confirm it is now marked converted.
- Open Email Integration, copy both tokens, and toggle the Email Pipe off and back on.
- Review the Inbox table's classification and status columns for any test emails received.
✅ Hands-On Practice 9.1 — Insight-to-Action Pipeline
Create three CII insights manually with realistic content (a feature request, a bug report, a praise/testimonial). Convert each to a different project object type (e.g. Task, Risk, Metric) and verify each converted item appears correctly in its destination module. Add a PM Note to one insight documenting your reasoning for the conversion choice.
✅ Hands-On Practice 9.2 — Classify and Triage a Realistic Inbox
Create six insights, one written to naturally fit each of: Complaint, Bug Report, Feature Request, Question, Feedback/Praise, and Other. For each, check whether the AI's automatic (or manually-triggered) classification matches what you intended, and correct any mismatches. Then move each insight to a different status across the lifecycle (some to Resolved, one to No Solution, one to Canceled) and use the Status Summary bar to confirm your counts are accurate.
Knowledge Check — Module 9
1. Which token should be shared with customers, NOT internal automation?
2. Into how many distinct project object types can a CII insight be converted?
3. What happens when the Email Pipe toggle is switched OFF?
4. Which of these is NOT one of the 8 AI intent classification types for a CII insight?
5. What is the correct main status progression for a CII insight?
6. Which terminal status fits an insight that was reviewed but has no available solution right now?
Sharing, API & Security Governance
Learning Objectives
- Share Tasks, Notes, Whiteboards, and full Projects securely with external parties
- Audit and revoke share links via Manage Shared Items
- Detect and respond to failed access attempts on password-protected shares
- Understand API Keys, permissions, rate limits, and the API Sandbox
Strategic leaders are accountable not just for delivery but for information governance — knowing exactly what has been shared with whom, for how long, and revoking access the moment it's no longer needed.
Shared Items Management
A central registry of every share link across five shareable object types: Task, Note, Whiteboard, Whiteboard Pro, and Project. Each row shows item type, title, creator, creation date, expiry (or Never), and status (Active/Expired). Copy Link, Edit (Project-type shares only), and Delete (immediate revocation) are available per link. A collapsible Recent Failed Access Attempts panel surfaces the last 10 wrong-password attempts with timestamp and IP — your early-warning system against brute-force probing.
API Management — Who Can Access, and the Dashboard
API Management and the API Sandbox are both restricted to the Admin role — Project Managers and Members cannot create or view API keys; ask your organization's admin if you need access. Every API request authenticates with an X-API-Key header (or an Authorization: Bearer token), and the External API currently exposes 28 documented endpoints across 8 resource categories: Projects, Tasks, Notes, Subtasks, Team Management, Budget Management, Activities, and Reports.
Four dashboard cards summarize activity: Total Keys (all ever created, including inactive), Active Keys, Today's API Calls, and Avg Response Time. Below them, a Security Alerts panel surfaces recent failed authentication attempts — repeated failures from the same IP can indicate a misconfigured integration or a leaked key being probed.
Creating a Key — Fields and Permissions
| Field | Required | Notes |
|---|---|---|
| Key Name | Yes | Your own label, e.g. "Zapier Integration" or "CI Pipeline" |
| Description | No | Optional notes on purpose |
| Project Access | Yes | One or more specific projects, or All Projects (current and future) |
| Permission Level | Yes | Read Only / Insert Only / Read & Insert — further refined by granular action checkboxes |
Granular action checkboxes restrict exactly what the key can do, grouped by the same 8 resource categories listed above (e.g. Task Management: list/create/update/delete task; Budget: get/create/update/delete budget item). Apply the principle of least privilege — a webhook that only reads tasks should not be able to delete budget items.
Rate Limits, Expiry, and IP Whitelisting
Each key has its own hourly (default 1,000) and daily (default 10,000) request limit; exceeding either returns HTTP 429. An optional expiration date auto-rejects the key afterward even without manual revocation — ideal for contractor or temporary integration access. An optional IP whitelist (one address per line, CIDR supported) rejects requests from any other IP with HTTP 403; for any server-to-server integration with a fixed source IP, this is the single most effective safeguard against a leaked key being misused.
Managing Existing Keys
The keys table shows name, masked value, status, covered projects, last-used timestamp, and usage counters. Per key: toggle Active/Inactive (suspend without deleting), View details (full permission set, limits, expiry, whitelist), and Revoke/Delete (permanent — any integration using that key immediately starts receiving 401 errors). To rotate a key safely: create the replacement first, update your integration, then revoke the old one — never revoke before the replacement is live.
API Sandbox — Building and Reading a Request
Two panels: Request (left) and Response (right). Building a request: select an active API key from the dropdown (the sandbox authenticates as that key — and sandbox calls do count against its rate limit) → choose a resource category (Tasks, Budget, Team, etc.) → choose an endpoint (shown with its HTTP method badge — GET/POST/DELETE — and description) → fill in parameters (required ones are marked with an asterisk; submitting without them returns 400) → Send Request.
The response panel shows the HTTP status code (200/201/400/401/403/429/500), response time in milliseconds, a syntax-highlighted JSON body with a Copy button, and ready-to-run cURL and wget command equivalents you can paste straight into a terminal or hand to a developer.
📺 Demo Walkthrough
- Share a Note externally with a password and a 7-day expiry.
- Open Manage Shared Items and locate that share in the table; confirm its expiry and status.
- Intentionally enter the wrong password once on the share link, then check the Recent Failed Access Attempts panel.
- Open API Management, create a Read Only key scoped to one project with just the Task Management actions enabled, and copy the key value immediately.
- In the Sandbox, select that key, choose the Tasks category, send a "list tasks" GET request, and review the JSON response plus the generated cURL command.
- Attempt a "create task" request with the same key and confirm it fails with 403 (since the key is Read Only) — then check the Security Alerts panel.
✅ Hands-On Practice 10.1 — Security Audit
Review every share link your Practice Project has accumulated across this course (tasks, notes, whiteboard, project overview). Delete any that are no longer needed for a real audience. Create one API key scoped read-only and test one GET-style endpoint in the Sandbox to confirm your integration credentials work as expected.
✅ Hands-On Practice 10.2 — Rotate a Key Safely
Create a second API key intended to replace your first one, with the same project access but an IP whitelist added and a 30-day expiration date set. Confirm in the sandbox that the new key works, then revoke the original key — never the other way around. Finally, try to "edit" the new key's permissions and confirm the UI requires revoke-and-recreate instead.
Knowledge Check — Module 10
1. Which shareable item type allows editing the share settings (not just copy/delete)?
2. How many recent failed access attempts does the security panel display?
3. What is the purpose of the API Sandbox?
4. Which roles can create or view API keys?
5. How do you change an existing API key's permissions or rate limits?
6. Does sending a request from the API Sandbox count against the selected key's rate limit?
7. What is the safe order of operations when rotating an API key?
The Studio — AI Document, Plan, Presentation & Report Generation
Learning Objectives
- Navigate the Studio hub and its four generation tools
- Generate emails and documents with the Composer across its category library
- Build a complete multi-section Plan using the three-step generation workflow
- Generate Presentation Outlines and Reports with type-specific options and detail levels
Why the Studio Exists
Every pillar from Module 0 eventually produces the same artifact: a document someone outside the platform needs to read — a board update, a vendor RFP, a risk register, a pitch deck, a compliance scorecard. Historically this is where AI-assisted project management quietly reverts to manual work: the data is structured, but turning it into a polished email, a 40-page business plan, or a stakeholder presentation still meant opening a blank document and writing it yourself. The Studio is the answer — four generation tools, all reading from the same live project data, that produce the actual deliverable instead of just the data behind it.
The Four Tools at a Glance
| Tool | Produces | Output |
|---|---|---|
| Email & Document Composer | A single email or document from a library of categorized templates | Copy to Clipboard, Save as Note, Download (HTML) |
| Project Plans Maker | A full, multi-section formal plan (Work Plan, Business Plan, Risk Management Plan, and ~27 more types) | Export Plan as HTML, Save Plan as Note |
| Presentation Outline Maker | A structured slide-by-slide outline for any of ~60 presentation types, plus standalone AI-generated visual elements (e.g. a pie chart of completed tasks) | Copy to Clipboard, Save as Note, Download Presentation |
| Report Maker | A formal report from a library of report types, each with its own relevant filters | Export as HTML |
Email & Document Composer
Templates are organized into 12 categories — Project Communication, Risk & Issue Management, Team Management, Stakeholder Relations, Vendor & External Relations, Financial Management, Marketing & Launch, Project Planning Documents, Strategy & Analysis, Operations & Process, Compliance & Governance, and Business Development — spanning everything from a Project Kickoff Email or Risk Escalation Email to a full Business Case Document or Data Privacy Policy. Filter the library by Email/Document type or search by keyword.
Selecting a template reveals a customization form: Recipient/Target Audience (always), and for emails — Subject, Sender Name/Title, Tone (Formal/Professional/Friendly/Urgent), Length (Brief/Standard/Detailed); for documents — Title, Length, Include Executive Summary, Include Appendices. Many templates add their own specific fields (e.g. a Business Plan template asks for Business Type and whether to include Financial Projections; a Delay Notification asks for Delay Length and Primary Reason). An Additional Context/Instructions box is always available. Click Generate to produce the composition, then Copy to Clipboard, Save as Note, or Download as an HTML file.
Project Plans Maker — the Three-Step Workflow
Nearly 30 plan types are available: Work Plan, Business Plan, Risk Management Plan, Change Management Plan, Cost Management Plan, Resource Management Plan, Stakeholder Management Plan, Project Execution Plan, Communication Plan, Quality Management Plan, Procurement Management Plan, Implementation Plan, Strategic Plan, 1/3/5 Year Business Plan, Contingency Plan, Training & Development Plan, Performance Management Plan, Technology/IT Management Plan, Safety & Compliance Plan, Marketing Plan, Sales Plan, Financial Plan, Succession Plan, Integration Plan (M&A), Exit Strategy Plan, Sustainability/ESG Plan, Crisis Management Plan, Data Management Plan, Capacity Planning, and a fully open-ended Custom Plan.
Unlike the Composer's single-shot generation, a Plan is built in three explicit steps so you can review structure before committing to content:
- 1. Generate Sections — AI proposes the plan's section outline (you can optionally steer it first with Special Instructions — preset suggestions include "Create only the 10 most essential sections," "Focus on sections required for investor presentations," or "Include industry-specific best practices"). You can manually add or remove sections before continuing.
- 2. Generate All Content — AI writes the full content for every section in sequence, with a live progress bar ("Generating section 3 of 10: 'Risk Register'") and a Stop button if you need to interrupt it.
- 3. Combine Plan — assembles every section into one document with an auto-generated Table of Contents.
From there: Export Plan as HTML or Save Plan as Note.
Presentation Outline Maker
A single dropdown organizes roughly 60 presentation types into categories: Project Management (Status Overview, Milestone Review, Post-Mortem, Lessons Learned, Roadmap...), Governance & Leadership (Steering Committee, Board of Directors, Executive Briefing, QBR...), Financial & Investment (Budget Review, Fundraising Pitch Deck, ROI Assessment...), Strategy & Business, Team & HR, Marketing & Sales, Technology & Innovation, Operations & Process, Risk & Compliance, Stakeholder Relations, and Corporate Responsibility. Add optional custom instructions, then click Generate Presentation Outline for a full slide-by-slide structure, or Generate a Visual Element to have AI produce a standalone chart/graphic (e.g. a pie chart of completed tasks) you can drop straight into a deck you're already building elsewhere. Outline actions: Regenerate, Copy to Clipboard, Save as Note, Download Presentation.
Report Maker
Report types are grouped by category — Project Management (Task Progress, Timeline & Milestone, Dependencies Analysis, Project Health Dashboard, Project Forecasting...), Financial Management (Budget Analysis, Cost-Benefit, Budget Variance, Cash Flow Projection, Financial Health Score...), Team Performance (Team Performance, Productivity Trends, Workload Balance, Skills Gap, Team Morale), Resource Management, Risk & Compliance (Risk Assessment, Compliance and Governance, Security & Privacy, Audit Trail, Regulatory Compliance Scorecard), Quality Assurance, Stakeholder Relations, Strategic Planning, and Operational Excellence. Each report type exposes its own relevant filters — a Budget Analysis report lets you filter by category and approval status, a Risk Assessment report by severity and category, a Team Performance report by team member and metric — plus a universal date-range filter (All Time, Last Week/Month/Quarter, YTD, Custom Range) and a detail level (Brief — 1 page, Detailed — 2-3 pages, Comprehensive — 4+ pages). Generate, Regenerate, or Export as HTML.
📺 Demo Walkthrough
- Open the Studio (Project Content Writer) and review its four cards.
- In the Composer, select a Stakeholder General Information email, fill in Recipient/Audience and Tone, add one line of Additional Context, and Generate; then Save as Note.
- In Plans Maker, select Risk Management Plan, run Generate Sections, review/edit the proposed outline, run Generate All Content and watch the progress bar, then Combine Plan and Export as HTML.
- In Presentation Outline Maker, select Steering Committee Update, add custom instructions focused on budget risk, Generate the outline, then try Generate a Visual Element for a completion-rate chart.
- In Report Maker, select Budget Analysis Report, set the date range to Last Quarter and detail level to Comprehensive, Generate, then Export as HTML.
✅ Hands-On Practice 10B.1 — One Project, Four Deliverables
Using your Practice Project, produce one deliverable from each Studio tool for the same underlying situation (e.g. a schedule slip you tracked with a Gantt baseline earlier in the course): a Delay Notification email (Composer), a Contingency Plan (Plans Maker, at least through Generate Sections and Generate All Content), a Steering Committee Update outline (Presentation Outline Maker) referencing the slip, and a Timeline & Milestone Report (Report Maker) covering the affected period. Compare how much of each you had to write yourself versus review and approve.
Knowledge Check — Module 10B
1. Which Studio tool would you use to produce a single Risk Escalation Email?
2. What is the correct order of the Plans Maker's three-step workflow?
3. What does "Generate a Visual Element" produce in the Presentation Outline Maker?
4. In Report Maker, what kind of filter is unique to each report type rather than universal?
Capstone Simulation — Run a Project as a Strategic Leader
Learning Objectives
- Integrate every module into a single end-to-end project lifecycle
- Demonstrate that AI handled the administrative layer while you made the strategic calls
- Produce a stakeholder-ready package using only AI-generated artifacts, reviewed and approved by you
The capstone is a single scenario that forces you to touch every module covered in this course, in the order a real initiative would require them, while you track and justify every strategic decision you made along the way.
📋 Capstone Checklist — Complete Every Step
- Genesis (Module 1): Create a new project from a one-paragraph description; use Suggest Fields with AI; generate the full project framework.
- Command Hub (Module 2): Run Evaluate Project Stages (IPEMC) and Find What's Missing immediately after creation; document the two biggest gaps surfaced.
- Tasks (Module 3): Use AI Brief to generate the full task plan as a Change Request; do not auto-apply — review it first.
- Governance (Module 7): Run AI Assessment on that Change Request, then Authorize and Apply it.
- Team (Module 5): Build a 6-person mixed team (internal, contractor, AI Agent); run Suggest Required Expertise and Smart Assign; generate a Work Order for the AI Agent.
- Budget (Module 6): Generate budget lines totalling within $40,000; run Justification Document on the largest line; move at least one line through full approval and a partial payment.
- Visualization (Module 4): Export a Gantt chart PNG and open the Mind Map Executive Dashboard to verify the 8-week timeline is coherent.
- Risk (Module 7): Generate a RAID+ Register and run Risk Assess on the top risk; create a mitigation task from it.
- Knowledge (Module 8): Run a What-if Scenario ("What if the contractor leaves mid-project?") and save the analysis.
- Stakeholder Communication (Modules 2, 4, 9): Use Meeting Planner to draft a kickoff agenda, set up the project's Email Integration and share the CII token with your "external stakeholder," and export the Project Pulse / RAG status for a written update.
- Studio deliverables (Module 10B): Use the Composer to produce a kickoff or status email, and the Plans Maker to generate at least the section outline of one formal plan relevant to your scenario.
- Governance close-out (Module 10): Review Manage Shared Items and revoke anything you no longer need before declaring the capstone complete.
✅ Capstone Deliverable
Produce a single exported package (use Export Project to HTML from the Hub) containing your finished project, and write a one-page reflection: for each of the four Strategic Leadership Pillars from Module 0, name the specific CoMng.AI feature that absorbed the administrative work, and the specific decision you personally made because that time was freed up. This reflection is the actual proof of the transition this course is named for.
Certification Final Exam
30 questions drawn across every module. A score of 80% or higher is required to unlock your certificate below.
Final Exam — 20 Questions
1. What is the core thesis of this course regarding AI in CoMng.AI?
2. Which project creation method reconstructs tasks with original statuses from a Jira or Asana export?
3. What four object types does Generate/Regenerate Project Framework produce?
4. A project is 35% complete with 32% of tasks overdue. What is its Schedule RAG colour?
5. What determines a task's priority score?
6. Which tool analyses all unassigned tasks and recommends the best-fit team member for each?
7. In Kanban Tag view, what happens when you try to drag a card to another column?
8. How is a Gantt task bar's end date determined if no explicit end date or due date exists?
9. What window of events does the Project Calendar's iCal subscription feed cover?
10. Which member type is distinct because it is "assigned tasks directly" and briefed via a generated Work Order document for automation pipelines?
11. Which AI action is available only for Contractors, not Internal or Partner members?
12. Which KPI on the Budget page is driven by actual recorded payments rather than line amounts?
13. Which AI budget tool turns an expense into a measurable Objectives and Key Results framework?
14. What is the correct full Change Request lifecycle?
15. Which of the following is NOT one of the six ways a Change Request can be created?
16. Which Whiteboard AI Quick Action synthesises board content into a structured Knowledge Base note?
17. Into how many distinct project object types can a Customer Insight be converted?
18. Which token should never be shared outside the organization?
19. What does the Recent Failed Access Attempts panel in Manage Shared Items help detect?
20. Per this course, what is the actual "proof" that a PM has made the transition from administrator to strategic leader?
21. Which Project Settings tool produces likelihood, impact, early-warning indicators, and mitigation strategy for a single identified risk?
22. Which AI tool generates 4 to 8 top-level epic parent tasks to start a project's Work Breakdown Structure?
23. What distinguishes "Offload to AI Agent" (per-task dropdown) from "Generate Work Order (AI Agent)" (Team page)?
24. What is the core difference between a Task and an Activity in CoMng.AI?
25. Without dependencies defined, which downstream feature is directly degraded?
26. What does the "Brainstorm" action on a task's AI dropdown do?
27. Which Studio tool builds a deliverable through a three-step Generate Sections → Generate All Content → Combine Plan workflow?
28. An API key's permissions need to change. What is the correct procedure?
29. In a real Offload to AI Agent work order, what three actions are mandatory after the agent completes every task?
30. What are the four main sequential statuses in a CII insight's lifecycle?